X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264122506000

Well Details

Well ID: 0264122506000
Loading map...
Location: 00/06-25-026-12W4/0
Location Alias: 00/06-25-26-12 W4M
Location Alias 2: 00/06-25-026-12 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 12
Section: 25
County/Municipality: Special Areas No. 2
Well Name: CALSTAN SUNNYNOOK 6-25-26-12
Operator Name: Chevron Canada Limited
License Number: 0016170
License Date: 1958-11-04
License Status: Re-Entered
Spud Date: 1958-11-08
Final Drill Date: 1958-11-27
Well Total Depth: 1251.20 m
Surface Hole Latitude: 51.247102
Surface Hole Longitude: -111.554410

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-04 Obtained License
1958-11-19 Drill Stem Test Performed
1958-11-20 Drill Stem Test Performed
1958-11-27 Drill Stem Test Performed
1958-11-27 Finished Drilling
1958-11-29 Production Casing Operation Performed
1958-12-15 Well Mode changed to Drilled and Cased
1965-06-05 Perforation Treatment Performed - Jet Perforation
1965-07-24 Perforation Treatment Performed - Jet Perforation
1965-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-10 Well Began Injection
1970-06-10 Well Fluid changed to Water
1970-06-10 Well Type changed to Disposal
1973-05-17 Perforation Treatment Performed - Cement Plug
1973-05-17 Well Abandoned
1973-05-17 Well Fluid changed to Water
1973-05-17 Well Mode changed to Abandoned
1973-05-17 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-06-05 Perforation 854.00 855.90 7
1965-09-23 Acid Treatment 854.00 863.80 0
1973-05-17 Cement Plug 826.00 960.70 0
1965-07-24 Perforation 856.50 857.10 7
1965-07-24 Perforation 858.00 858.30 7
1965-07-24 Perforation 859.20 859.50 7
1965-07-24 Perforation 859.80 860.10 7
1965-07-24 Perforation 860.50 861.10 7
1965-07-24 Perforation 861.70 862.30 7
1965-07-24 Perforation 863.20 863.50 7
1965-07-24 Perforation 863.50 863.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0

For data sources see[5]

References