If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264122308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.233778,"lon":-111.567993,"icon":""}]} |
Location: 00/08-23-026-12W4/0 | |
Location Alias: 00/08-23-26-12 W4M | |
Location Alias 2: 00/08-23-026-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 12 | |
Section: 23 | |
County/Municipality: Special Areas No. 2 | |
Well Name: RENAISSANCE CESSFORD 8-23-26-12 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0134877 | |
License Date: 1988-07-12 | |
License Status: RecCertified | |
Spud Date: 1988-10-03 | |
Final Drill Date: 1988-10-07 | |
Well Total Depth: 1085.00 m | |
Surface Hole Latitude: 51.233778 | |
Surface Hole Longitude: -111.567993 |
Date | Event |
---|---|
1988-07-12 | Obtained License |
1988-10-04 | Surface Casing Operation Performed |
1988-10-07 | Finished Drilling |
1988-10-07 | Well Log Performed |
1988-10-07 | Well Mode changed to Drilled and Cased |
1988-10-08 | Production Casing Operation Performed |
1988-10-08 | Rig Released |
1988-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-10-17 | Perforation Treatment Performed - Jet Perforation |
1988-10-17 | Plug Back Performed |
1989-06-16 | Well Began Production |
1989-06-16 | Well Fluid changed to Gas |
1989-06-16 | Well Mode changed to Flowing |
1990-09-04 | Perforation Treatment Performed - Cement Squeeze |
1990-09-04 | Perforation Treatment Performed - Jet Perforation |
1990-09-06 | Perforation Treatment Performed - Jet Perforation |
1994-01-31 | Well Fluid changed to Gas |
1994-01-31 | Well Mode changed to Suspended |
1994-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-02-18 | Plug Back Performed |
1994-02-18 | Well Abandoned |
1994-02-18 | Well Fluid changed to Gas |
1994-02-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-10-17 | Perforation | 1035.00 | 1036.00 | 13 |
1988-10-17 | Packing Device Capped w/Cement | 1025.00 | 1033.00 | 0 |
1988-10-17 | Perforation | 865.50 | 867.00 | 13 |
1988-10-17 | Perforation | 867.50 | 869.00 | 13 |
1990-09-04 | Perforation | 876.00 | 877.00 | 13 |
1990-09-04 | Cement Squeeze | 865.50 | 877.00 | 0 |
1990-09-06 | Perforation | 870.50 | 872.00 | 13 |
1994-02-18 | Packing Device Capped w/Cement | 851.00 | 859.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 2281 | 0.0 | 0.0 | 0.0 |
1990 | 2351 | 0.0 | 0.0 | 0.0 |
1991 | 7183 | 0.0 | 0.0 | 0.0 |
1992 | 8626 | 0.0 | 0.0 | 0.0 |
1993 | 415 | 0.0 | 0.0 | 0.0 |
For data sources see[5]