X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264102811000

Well Details

Well ID: 0264102811000
Loading map...
Location: 00/11-28-026-10W4/0
Location Alias: 00/11-28-26-10 W4M
Location Alias 2: 00/11-28-026-10 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 10
Section: 28
County/Municipality: Special Areas No. 2
Well Name: WECO CDN-SUP SUNNYNOOK 11-28-26-10
Operator Name: TAQA North Ltd.
License Number: 0040657
License Date: 1971-08-24
License Status: RecCertified
Spud Date: 1971-08-26
Final Drill Date: 1971-08-30
Well Total Depth: 1080.50 m
Surface Hole Latitude: 51.252188
Surface Hole Longitude: -111.346652

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-08-24 Obtained License
1971-08-30 Drill Stem Test Performed
1971-08-30 Finished Drilling
1971-08-30 Well Log Performed
1971-08-30 Well Mode changed to Drilled and Cased
1971-09-01 Production Casing Operation Performed
1971-09-02 Perforation Treatment Performed - Jet Perforation
1971-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-04 Perforation Treatment Performed - Fractured
1971-10-03 Well Began Production
1971-10-03 Well Fluid changed to Crude Oil
1971-10-03 Well Mode changed to Flowing
1972-09-20 Well Fluid changed to Crude Oil
1972-09-20 Well Mode changed to Pumping
1973-12-01 Well Fluid changed to Crude Oil
1973-12-01 Well Mode changed to Suspended
1975-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-08-08 Well Abandoned
1975-08-08 Well Fluid changed to Crude Oil
1975-08-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-09-02 Perforation 1030.50 1032.10 7
1971-09-03 Acid Treatment 1030.50 1032.10 0
1971-09-04 Fracture 1030.50 1032.10 0
1975-08-08 Packing Device Capped w/Cement 1013.50 1021.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 587 0.0 0.0 0.0
1972 2400 0.0 0.0 0.0

For data sources see[5]

References