X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264093402000

Well Details

Well ID: 0264093402000
Loading map...
Location: 00/02-34-026-09W4/0
Location Alias: 00/02-34-26-09 W4M
Location Alias 2: 00/02-34-026-09 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 09
Section: 34
County/Municipality: Special Areas No. 3
Well Name: ATAPCO ET AL HEATHDALE 2-34-26-9
Operator Name: American Trading and Production Corporation
License Number: 0141039
License Date: 1989-09-25
License Status: RecCertified
Spud Date: 1989-10-01
Final Drill Date: 1989-10-08
Well Total Depth: 1290.00 m
Surface Hole Latitude: 51.259159
Surface Hole Longitude: -111.179124

For data sources see[1][2]

Well History

Date Event
1989-09-25 Obtained License
1989-10-02 Surface Casing Operation Performed
1989-10-08 Finished Drilling
1989-10-08 Well Log Performed
1989-10-08 Well Mode changed to Drilled and Cased
1989-10-09 Drill Stem Test Performed
1989-10-10 Production Casing Operation Performed
1989-10-10 Rig Released
1989-10-15 Well Log Performed
1989-10-19 Perforation Treatment Performed - Jet Perforation
1989-10-19 Well Log Performed
1989-12-16 Well Began Production
1989-12-16 Well Fluid changed to Gas
1989-12-16 Well Mode changed to Flowing
1990-09-13 Perforation Treatment Performed - Jet Perforation
1990-09-13 Well Log Performed
1990-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-14 Perforation Treatment Performed - Cement Squeeze
1990-09-15 Perforation Treatment Performed - Jet Perforation
1990-09-15 Well Log Performed
1992-05-01 Well Fluid changed to Gas
1992-05-01 Well Mode changed to Suspended
1993-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-28 Well Fluid changed to Gas
1993-07-28 Well Log Performed
1993-07-28 Well Mode changed to Abandoned Zone
1993-07-29 Perforation Treatment Performed - Jet Perforation
1995-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-11 Plug Back Performed
1995-09-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-19 Perforation 1014.00 1015.00 13
1990-09-13 Perforation 1017.00 1018.00 13
1990-09-14 Acid Treatment 1014.00 1018.00 0
1990-09-14 Cement Squeeze 1014.00 1018.00 0
1990-09-15 Perforation 1011.50 1012.50 13
1993-07-28 Packing Device Capped w/Cement 997.00 1005.00 0
1993-07-29 Perforation 856.00 858.00 13
1995-09-11 Packing Device Capped w/Cement 839.30 847.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 282 0.0 0.0 0.0
1990 5423 0.0 0.0 0.0

For data sources see[5]

References