X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264091208000

Well Details

Well ID: 0264091208000
Loading map...
Location: 00/08-12-026-09W4/0
Location Alias: 00/08-12-26-09 W4M
Location Alias 2: 00/08-12-026-09 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 09
Section: 12
County/Municipality: Special Areas No. 3
Well Name: PENN WEST HEATHDLE 8-12-26-9
Operator Name: Obsidian Energy Ltd.
License Number: 0322014
License Date: 2004-12-17
License Status: Abandoned
Spud Date: 2005-01-08
Final Drill Date: 2005-01-15
Well Total Depth: 1060.00 m
Surface Hole Latitude: 51.202735
Surface Hole Longitude: -111.125897

For data sources see[1][2]

Well History

Date Event
2004-01-16 Well Log Performed
2004-12-17 Obtained License
2005-01-12 Surface Casing Operation Performed
2005-01-15 Finished Drilling
2005-01-15 Well Log Performed
2005-01-15 Well Mode changed to Drilled and Cased
2005-01-16 Well Log Performed
2005-01-17 Production Casing Operation Performed
2005-01-17 Rig Released
2005-02-02 Well Log Performed
2005-02-03 Perforation Treatment Performed - Jet Perforation
2005-02-04 Perforation Treatment Performed - Jet Perforation
2005-02-06 Perforation Treatment Performed - Cement Squeeze
2005-02-06 Plug Back Performed
2005-02-07 Perforation Treatment Performed - Jet Perforation
2005-02-07 Perforation Treatment Performed - Remedial Casing
2005-04-01 Well Began Production
2005-04-01 Well Fluid changed to Gas
2005-04-01 Well Mode changed to Flowing
2011-08-26 Well Fluid changed to Gas
2011-08-26 Well Mode changed to Suspended
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Flowing
2019-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-26 Plug Back Performed
2019-10-26 Well Fluid changed to Gas
2019-10-26 Well Log Performed
2019-10-26 Well Mode changed to Abandoned Zone
2019-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-27 Perforation Treatment Performed - Jet Perforation
2019-10-27 Plug Back Performed
2019-10-27 Well Log Performed
2019-10-28 Perforation Treatment Performed - Cement Squeeze
2019-10-28 Plug Back Performed
2019-12-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-03 Perforation 1021.00 1024.00 13
2019-10-27 Perforation 263.00 264.00 17
2019-10-28 Cement Squeeze 263.00 264.00 0
2005-02-04 Perforation 849.00 850.00 17
2005-02-06 Cement Squeeze 849.00 850.00 0
2005-02-07 Perforation 649.00 650.00 17
2005-02-07 Remedial Casing Cementing 649.00 650.00 0
2005-02-07 Perforation 517.00 518.00 13
2005-02-07 Remedial Casing Cementing 517.00 518.00 0
2019-10-26 Packing Device Capped w/Cement 1007.00 1015.00 0
2019-10-27 Packing Device Capped w/Cement 837.00 845.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 6599 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8742 0.0 0.0 0.0
2009 7487 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References