X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264071208000

Well Details

Well ID: 0264071208000
Loading map...
Location: 00/08-12-026-07W4/0
Location Alias: 00/08-12-26-07 W4M
Location Alias 2: 00/08-12-026-07 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 07
Section: 12
County/Municipality: Special Areas No. 3
Well Name: ATAPCO SHANNON 8-12-26-7
Operator Name: American Trading and Production Corporation
License Number: 0117762
License Date: 1985-09-19
License Status: RecCertified
Spud Date: 1985-09-23
Final Drill Date: 1985-10-02
Well Total Depth: 959.00 m
Surface Hole Latitude: 51.204437
Surface Hole Longitude: -110.847350

For data sources see[1][2]

Well History

Date Event
1985-09-19 Obtained License
1985-09-24 Surface Casing Operation Performed
1985-09-30 Well Log Performed
1985-10-01 Drill Stem Test Performed
1985-10-02 Finished Drilling
1985-10-02 Production Casing Operation Performed
1985-10-02 Rig Released
1985-10-12 Well Mode changed to Drilled and Cased
1985-10-19 Well Log Performed
1985-10-21 Perforation Treatment Performed - Jet Perforation
1985-10-23 Perforation Treatment Performed - Fractured
1987-07-22 Well Fluid changed to Gas
1987-07-22 Well Log Performed
1987-07-22 Well Mode changed to Testing
1987-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-23 Perforation Treatment Performed - Jet Perforation
1987-07-23 Plug Back Performed
1987-07-23 Well Fluid changed to Gas
1987-07-23 Well Mode changed to Abandoned Zone
1991-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-04-23 Plug Back Performed
1991-04-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-21 Perforation 936.50 939.50 13
1985-10-23 Fracture 936.50 939.50 0
1987-07-23 Packing Device Capped w/Cement 917.00 925.00 0
1987-07-23 Perforation 255.00 256.80 13
1991-04-23 Packing Device Capped w/Cement 242.00 250.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 24 0.0 0.0 0.0

For data sources see[5]

References