X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0264031209004

Well Details

Well ID: 0264031209004
Loading map...
Location: 00/09-12-026-03W4/4
Location Alias: 00/09-12-26-03 W4M
Location Alias 2: 00/09-12-026-03 W4/04
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 03
Section: 12
County/Municipality: Municipal District of Acadia No. 34
Well Name: 1WPETRO CAPRON 9-12-26-3
Operator Name: Saphonyx Energy Inc.
License Number: 0359748
License Date: 2006-07-04
License Status: Abandoned
Spud Date: 2006-08-08
Final Drill Date: 2006-08-10
Well Total Depth: 1031.00 m
Surface Hole Latitude: 51.207731
Surface Hole Longitude: -110.289628

For data sources see[1][2]

Well History

Date Event
2006-07-04 Obtained License
2006-08-08 Surface Casing Operation Performed
2006-08-10 Finished Drilling
2006-08-10 Production Casing Operation Performed
2006-08-10 Well Log Performed
2006-08-10 Well Mode changed to Drilled and Cased
2006-08-11 Rig Released
2006-10-07 Perforation Treatment Performed - Jet Perforation
2006-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-14 Perforation Treatment Performed - Jet Perforation
2006-10-14 Plug Back Performed
2006-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-17 Perforation Treatment Performed - Jet Perforation
2006-10-17 Plug Back Performed
2007-01-27 Perforation Treatment Performed - Jet Perforation
2007-02-03 Well Began Production
2007-02-03 Well Fluid changed to Gas
2007-02-03 Well Mode changed to Flowing
2007-06-12 Well Fluid changed to Gas
2007-06-12 Well Mode changed to Flowing
2007-07-29 Well Log Performed
2009-03-09 Well Fluid changed to Gas
2009-03-09 Well Mode changed to Closed
2009-05-13 Well Fluid changed to Gas
2009-05-13 Well Mode changed to Flowing
2010-12-09 Well Fluid changed to Gas
2010-12-09 Well Mode changed to Closed
2011-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-15 Plug Back Performed
2011-06-15 Well Fluid changed to Gas
2011-06-15 Well Log Performed
2011-06-15 Well Mode changed to Abandoned Zone
2011-06-28 Well Abandoned
2011-06-28 Well Fluid changed to Gas
2011-06-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-07 Perforation 973.00 978.00 17
2011-06-15 Packing Device Capped w/Cement 772.00 780.00 0
2006-10-14 Perforation 960.00 961.50 17
2006-10-14 Perforation 954.00 956.00 17
2006-10-14 Perforation 948.50 950.00 17
2006-10-14 Packing Device Capped w/Cement 970.00 971.00 0
2006-10-17 Packing Device Capped w/Cement 938.00 946.00 0
2006-10-17 Perforation 868.50 869.50 17
2007-01-27 Perforation 784.50 785.50 17
2011-06-15 Packing Device Capped w/Cement 848.50 856.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1779 0.0 0.0 0.0
2008 21 0.0 0.0 0.0

For data sources see[5]

References