X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0255061408000

Well Details

Well ID: 0255061408000
Loading map...
Location: 00/08-14-025-06W5/0
Location Alias: 00/08-14-25-06 W5M
Location Alias 2: 00/08-14-025-06 W5/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 5
Range: 06
Section: 14
County/Municipality: Municipal District of Bighorn No. 8
Well Name: SHELL 7 UNIT JUMPW 2-14-25-6
Operator Name: Shell Canada Limited
License Number: 0035886
License Date: 1969-02-25
License Status: Issued
Spud Date: 1969-03-12
Final Drill Date: 1969-08-28
Well Total Depth: 3778.90 m
Surface Hole Latitude: 51.127449
Surface Hole Longitude: -114.731179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-25 Obtained License
1969-08-17 Production Casing Operation Performed
1969-08-21 Drill Stem Test Performed
1969-08-28 Finished Drilling
1969-08-28 Well Mode changed to Drilled and Cased
1969-08-30 Drill Stem Test Performed
1969-09-01 Drill Stem Test Performed
1969-09-01 Perforation Treatment Performed - Bullet Perforation
1969-09-03 Drill Stem Test Performed
1969-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-09-06 Perforation Treatment Performed - Jet Perforation
1969-09-06 Perforation Treatment Performed - Selective Jet Perforations
1969-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-29 Well Began Production
1969-10-29 Well Fluid changed to Gas
1969-10-29 Well Mode changed to Flowing
1969-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-28 Well Fluid changed to Gas
2018-06-28 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-01 Bullet Perforation 3632.30 3636.00 7
1969-09-06 Selective Jet Perforations 3351.00 3392.40 0
1969-09-06 Selective Jet Perforations 3393.00 3398.80 0
1969-09-06 Selective Jet Perforations 3402.20 3402.80 0
1969-09-06 Selective Jet Perforations 3404.00 3405.80 0
1969-09-06 Selective Jet Perforations 3407.40 3410.10 0
1969-09-06 Selective Jet Perforations 3415.00 3417.40 0
1969-09-06 Selective Jet Perforations 3419.90 3424.70 0
1969-09-06 Selective Jet Perforations 3425.60 3429.60 0
1969-09-06 Selective Jet Perforations 3430.20 3433.90 0
1969-09-06 Selective Jet Perforations 3439.70 3441.50 0
1969-09-01 Bullet Perforation 3637.80 3642.10 7
1969-09-06 Selective Jet Perforations 3452.50 3455.20 0
1969-09-06 Selective Jet Perforations 3456.70 3461.90 0
1969-09-06 Selective Jet Perforations 3463.10 3464.70 0
1969-09-06 Selective Jet Perforations 3467.10 3468.30 0
1969-09-06 Selective Jet Perforations 3470.80 3476.90 0
1969-09-06 Selective Jet Perforations 3477.20 3485.40 0
1969-09-06 Selective Jet Perforations 3487.50 3491.80 0
1969-09-06 Selective Jet Perforations 3497.30 3510.40 0
1969-09-06 Selective Jet Perforations 3512.50 3513.10 0
1969-09-06 Selective Jet Perforations 3517.40 3518.30 0
1969-09-05 Packing Device Capped w/Cement 3596.60 3596.60 0
1969-09-06 Selective Jet Perforations 3521.70 3522.30 0
1969-09-06 Selective Jet Perforations 3528.70 3532.30 0
1969-09-06 Selective Jet Perforations 3538.70 3546.00 0
1969-09-06 Selective Jet Perforations 3551.50 3554.30 0
1969-09-06 Selective Jet Perforations 3558.80 3561.30 0
1969-09-06 Selective Jet Perforations 3564.30 3566.20 0
1969-09-06 Perforation 3333.00 3333.00 7
1969-09-06 Perforation 3339.10 3339.10 7
1969-09-06 Perforation 3451.60 3451.60 7
1969-09-06 Perforation 3457.70 3457.70 7
1969-09-06 Selective Jet Perforations 3308.30 3309.50 3
1969-09-06 Perforation 3472.00 3472.00 7
1969-09-06 Perforation 3529.90 3529.90 7
1969-09-06 Perforation 3555.20 3555.20 7
1969-09-06 Perforation 3557.00 3557.00 7
1969-10-28 Acid Treatment 3308.30 3566.20 0
1969-11-24 Acid Treatment 3308.30 3566.20 0
1969-09-06 Selective Jet Perforations 3310.70 3315.00 0
1969-09-06 Selective Jet Perforations 3325.70 3329.30 0
1969-09-06 Selective Jet Perforations 3331.50 3333.90 0
1969-09-06 Selective Jet Perforations 3337.00 3344.00 0
1969-09-06 Selective Jet Perforations 3345.80 3348.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1089 0.0 0.0 0.0
1970 5582 0.0 0.0 0.0
1971 6043 0.0 0.0 0.0
1972 7524 0.0 0.0 0.0
1973 7241 0.0 0.0 0.0
1974 8161 0.0 0.0 0.0
1975 8027 0.0 0.0 0.0
1976 7231 0.0 0.0 0.0
1977 6927 0.0 0.0 0.0
1978 7692 0.0 0.0 0.0
1979 6558 0.0 0.0 0.0
1980 5050 0.0 0.0 0.0
1981 6379 0.0 0.0 0.0
1982 7764 0.0 0.0 0.0
1983 6709 0.0 0.0 0.0
1984 4034 0.0 0.0 0.0
1985 3980 0.0 0.0 0.0
1986 7198 0.0 0.0 0.0
1987 4485 0.0 0.0 0.0
1988 4702 0.0 0.0 0.0
1989 5561 0.0 0.0 0.0
1990 6055 0.0 0.0 0.0
1991 5479 0.0 0.0 0.0
1992 6004 0.0 0.0 0.0
1993 8476 0.0 0.0 0.0
1994 8619 0.0 0.0 0.0
1995 8621 0.0 0.0 0.0
1996 8714 0.0 0.0 0.0
1997 8271 0.0 0.0 0.0
1998 8671 0.0 0.0 0.0
1999 8632 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 8743 0.0 0.0 0.0
2002 8719 0.0 0.0 0.0
2003 8332 0.0 0.0 0.0
2004 8727 0.0 0.0 0.0
2005 8581 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8150 0.0 0.0 0.0
2008 8768 0.0 0.0 0.0
2009 6992 0.0 0.0 0.0
2010 8698 0.0 0.0 0.0
2011 8716 0.0 0.0 0.0
2012 6651 0.0 0.0 0.0
2013 7716 0.0 0.0 0.0
2014 8099 0.0 0.0 0.0
2015 8410 0.0 0.0 0.0
2016 8481 0.0 0.0 0.0
2017 7913 0.0 0.0 0.0
2018 8607 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[5]

References