X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254283111000

Well Details

Well ID: 0254283111000
Loading map...
Location: 00/11-31-025-28W4/0
Location Alias: 00/11-31-25-28 W4M
Location Alias 2: 00/11-31-025-28 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 28
Section: 31
County/Municipality: Rocky View County
Well Name: JEFF LAKE MOBIL CROSS 11-31-25-28
Operator Name: CNOOC Petroleum North America ULC
License Number: 0025187
License Date: 1963-11-21
License Status: RecCertified
Spud Date: 1963-11-24
Final Drill Date: 1964-01-01
Well Total Depth: 2640.80 m
Surface Hole Latitude: 51.178335
Surface Hole Longitude: -113.903102

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-21 Obtained License
1963-12-17 Drill Stem Test Performed
1963-12-29 Drill Stem Test Performed
1963-12-30 Drill Stem Test Performed
1964-01-01 Finished Drilling
1964-01-01 Well Mode changed to Drilled and Cased
1964-01-05 Liner Casing Operation Performed
1964-01-06 Perforation Treatment Performed - Open-Hole Completion
1964-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-05 Well Began Production
1964-03-05 Well Fluid changed to Gas
1964-03-05 Well Mode changed to Flowing
1964-12-22 Perforation Treatment Performed - Jet Perforation
1982-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-21 Perforation Treatment Performed - Jet Perforation
1982-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-03-03 Well Abandoned
1982-03-03 Well Fluid changed to Gas
1982-03-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-06 Open Hole/Barefoot Completion 2605.70 2640.80 0
1964-01-12 Acid Treatment 2605.70 2640.80 0
1964-01-15 Acid Treatment 2605.70 2640.80 0
1964-12-22 Perforation 2605.70 2627.40 7
1982-02-20 Packing Device Capped w/Cement 2288.20 2296.70 0
1982-02-21 Perforation 2205.40 2210.30 7
1982-02-26 Acid Treatment 2205.40 2210.30 0
1982-03-03 Packing Device Capped w/Cement 2191.00 2198.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1127 0.0 0.0 0.0
1969 8151 0.0 0.0 0.0
1970 5194 0.0 0.0 0.0
1971 7188 0.0 0.0 0.0
1972 3823 0.0 0.0 0.0
1973 4840 0.0 0.0 0.0
1974 5456 0.0 0.0 0.0
1975 137 0.0 0.0 0.0
1976 4039 0.0 0.0 0.0
1977 3469 0.0 0.0 0.0
1978 220 0.0 0.0 0.0

For data sources see[5]

References