X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254270216000

Well Details

Well ID: 0254270216000
Loading map...
Location: 00/16-02-025-27W4/0
Location Alias: 00/16-02-25-27 W4M
Location Alias 2: 00/16-02-025-27 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 27
Section: 02
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 16-2-25-27
Operator Name: Ember Resources Inc.
License Number: 0236346
License Date: 2000-04-19
License Status: Amended
Spud Date: 2000-06-13
Final Drill Date: 2000-06-15
Well Total Depth: 1128.00 m
Surface Hole Latitude: 51.107454
Surface Hole Longitude: -113.656757

For data sources see[1][2]

Well History

Date Event
2000-04-19 Obtained License
2000-06-14 Surface Casing Operation Performed
2000-06-15 Finished Drilling
2000-06-15 Production Casing Operation Performed
2000-06-15 Rig Released
2000-06-15 Well Mode changed to Drilled and Cased
2000-06-21 Well Log Performed
2000-07-18 Perforation Treatment Performed - Jet Perforation
2000-07-23 Perforation Treatment Performed - Jet Perforation
2000-08-17 Perforation Treatment Performed - Fractured
2000-11-26 Well Began Production
2000-11-26 Well Fluid changed to Gas
2000-11-26 Well Mode changed to Flowing
2003-10-09 Perforation Treatment Performed - Jet Perforation
2003-10-16 Perforation Treatment Performed - Fractured
2004-03-02 Well Log Performed
2007-05-01 Well Fluid changed to Gas
2007-05-01 Well Mode changed to Suspended
2017-04-24 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-18 Perforation 995.00 998.00 7
2003-10-09 Perforation 644.20 645.20 13
2003-10-09 Perforation 632.20 634.20 13
2003-10-09 Perforation 628.50 629.50 13
2003-10-09 Perforation 604.70 605.70 13
2003-10-09 Perforation 578.40 580.40 13
2003-10-09 Perforation 562.80 563.80 13
2003-10-09 Perforation 557.40 558.40 13
2003-10-09 Perforation 538.00 539.00 13
2003-10-09 Perforation 529.70 530.70 13
2003-10-09 Perforation 527.80 528.80 13
2000-07-23 Perforation 774.50 777.50 7
2003-10-09 Perforation 524.20 525.20 13
2003-10-09 Perforation 514.60 515.60 13
2003-10-09 Perforation 505.60 506.60 13
2003-10-09 Perforation 448.10 449.10 13
2003-10-09 Perforation 397.20 398.20 13
2003-10-09 Perforation 375.60 376.60 13
2003-10-09 Perforation 372.70 373.70 13
2003-10-09 Perforation 343.70 344.70 13
2003-10-09 Perforation 270.70 271.70 13
2003-10-09 Perforation 262.70 263.70 13
2000-08-17 Fracture 774.50 777.50 0
2003-10-09 Perforation 245.80 246.80 13
2003-10-09 Perforation 219.30 220.30 13
2003-10-16 Fracture 219.30 698.90 0
2003-10-09 Perforation 697.90 698.90 13
2003-10-09 Perforation 696.90 697.90 13
2003-10-09 Perforation 694.30 695.30 13
2003-10-09 Perforation 673.50 674.50 13
2003-10-09 Perforation 661.20 662.20 13
2003-10-09 Perforation 654.20 656.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 864 0.0 0.0 0.0
2001 8680 0.0 0.0 0.0
2002 8756 0.0 0.0 0.0
2003 8672 0.0 0.0 0.0
2004 8005 0.0 0.0 0.0
2005 8472 0.0 0.0 0.0
2006 8706 0.0 0.0 0.0
2007 2767 0.0 0.0 0.0

For data sources see[5]

References