If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254263512003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.179661,"lon":-113.534702,"icon":""}]} |
Location: 00/12-35-025-26W4/3 | |
Location Alias: 00/12-35-25-26 W4M | |
Location Alias 2: 00/12-35-025-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 35 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 12-35-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0271192 | |
License Date: 2002-06-24 | |
License Status: Issued | |
Spud Date: 2002-06-27 | |
Final Drill Date: 2002-06-30 | |
Well Total Depth: 1015.00 m | |
Surface Hole Latitude: 51.179661 | |
Surface Hole Longitude: -113.534702 |
Date | Event |
---|---|
2002-06-24 | Obtained License |
2002-06-27 | Surface Casing Operation Performed |
2002-06-30 | Finished Drilling |
2002-06-30 | Production Casing Operation Performed |
2002-06-30 | Rig Released |
2002-06-30 | Well Mode changed to Drilled and Cased |
2002-07-29 | Well Log Performed |
2002-09-04 | Perforation Treatment Performed - Jet Perforation |
2002-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-23 | Perforation Treatment Performed - Jet Perforation |
2002-09-23 | Plug Back Performed |
2002-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-10-07 | Plug Back Performed |
2002-10-08 | Perforation Treatment Performed - Jet Perforation |
2002-11-13 | Perforation Treatment Performed - Fractured |
2002-12-08 | Perforation Treatment Performed - Jet Perforation |
2002-12-15 | Perforation Treatment Performed - Jet Perforation |
2003-01-09 | Perforation Treatment Performed - Fractured |
2003-01-19 | Perforation Treatment Performed - Jet Perforation |
2003-02-07 | Perforation Treatment Performed - Jet Perforation |
2003-02-11 | Perforation Treatment Performed - Jet Perforation |
2003-05-30 | Perforation Treatment Performed - Fractured |
2003-07-02 | Perforation Treatment Performed - Jet Perforation |
2003-07-02 | Well Log Performed |
2003-07-14 | Perforation Treatment Performed - Remedial Casing |
2003-07-22 | Perforation Treatment Performed - Jet Perforation |
2003-07-22 | Well Log Performed |
2003-07-30 | Perforation Treatment Performed - Remedial Casing |
2003-08-16 | Well Began Production |
2003-08-16 | Well Fluid changed to Gas |
2003-08-16 | Well Mode changed to Flowing |
2018-01-17 | Perforation Treatment Performed - Jet Perforation |
2018-01-17 | Well Log Performed |
2018-01-25 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-09-04 | Perforation | 908.00 | 910.00 | 13 |
2002-12-15 | Perforation | 531.00 | 533.00 | 13 |
2003-01-09 | Fracture | 531.00 | 540.00 | 0 |
2003-01-19 | Perforation | 511.00 | 517.00 | 13 |
2003-02-07 | Perforation | 476.00 | 482.00 | 13 |
2003-02-11 | Perforation | 424.00 | 429.00 | 13 |
2003-05-30 | Fracture | 424.00 | 429.00 | 0 |
2003-07-02 | Perforation | 185.00 | 186.00 | 13 |
2003-07-14 | Remedial Casing Cementing | 185.00 | 186.00 | 0 |
2003-07-22 | Perforation | 185.00 | 186.00 | 13 |
2003-07-30 | Remedial Casing Cementing | 185.00 | 186.00 | 0 |
2002-09-23 | Packing Device Capped w/Cement | 890.00 | 898.00 | 0 |
2018-01-17 | Perforation | 278.00 | 280.00 | 13 |
2018-01-17 | Perforation | 307.00 | 308.00 | 13 |
2018-01-17 | Perforation | 329.30 | 330.30 | 13 |
2018-01-17 | Perforation | 341.00 | 343.00 | 13 |
2018-01-17 | Perforation | 381.00 | 382.00 | 13 |
2018-01-17 | Perforation | 444.00 | 445.00 | 13 |
2018-01-17 | Perforation | 446.90 | 447.90 | 13 |
2018-01-17 | Perforation | 451.00 | 453.00 | 13 |
2018-01-17 | Perforation | 463.00 | 464.00 | 13 |
2018-01-17 | Perforation | 484.00 | 485.00 | 13 |
2002-09-23 | Perforation | 705.00 | 706.00 | 7 |
2018-01-17 | Perforation | 489.10 | 490.60 | 13 |
2018-01-17 | Perforation | 504.00 | 507.00 | 13 |
2018-01-17 | Perforation | 527.50 | 528.50 | 13 |
2018-01-17 | Perforation | 547.00 | 548.00 | 13 |
2018-01-17 | Perforation | 554.00 | 555.00 | 13 |
2018-01-17 | Perforation | 558.10 | 559.10 | 13 |
2018-01-17 | Perforation | 567.20 | 568.20 | 13 |
2018-01-17 | Perforation | 574.40 | 575.40 | 13 |
2018-01-17 | Perforation | 584.60 | 585.60 | 13 |
2018-01-17 | Perforation | 615.90 | 616.90 | 13 |
2002-10-07 | Packing Device Capped w/Cement | 695.00 | 702.00 | 0 |
2018-01-17 | Perforation | 620.80 | 621.80 | 13 |
2018-01-25 | Fracture | 278.00 | 280.00 | 0 |
2018-01-25 | Fracture | 307.00 | 308.00 | 0 |
2018-01-25 | Fracture | 329.30 | 330.30 | 0 |
2018-01-25 | Fracture | 341.00 | 343.00 | 0 |
2018-01-25 | Fracture | 381.00 | 382.00 | 0 |
2018-01-25 | Fracture | 444.00 | 445.00 | 0 |
2018-01-25 | Fracture | 446.90 | 447.90 | 0 |
2018-01-25 | Fracture | 451.00 | 453.00 | 0 |
2018-01-25 | Fracture | 463.00 | 464.00 | 0 |
2002-10-08 | Perforation | 689.00 | 692.00 | 13 |
2018-01-25 | Fracture | 504.00 | 507.00 | 0 |
2018-01-25 | Fracture | 527.50 | 528.50 | 0 |
2018-01-25 | Fracture | 554.00 | 555.00 | 0 |
2018-01-25 | Fracture | 558.10 | 559.10 | 0 |
2018-01-25 | Fracture | 567.20 | 568.20 | 0 |
2018-01-25 | Fracture | 574.40 | 575.40 | 0 |
2018-01-25 | Fracture | 584.60 | 585.60 | 0 |
2018-01-25 | Fracture | 615.90 | 616.90 | 0 |
2018-01-25 | Fracture | 620.80 | 621.80 | 0 |
2002-10-08 | Perforation | 682.00 | 685.00 | 13 |
2002-11-13 | Fracture | 682.00 | 692.00 | 0 |
2002-12-08 | Perforation | 623.00 | 625.00 | 13 |
2002-12-15 | Perforation | 536.00 | 540.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 2579 | 0.0 | 0.0 | 0.0 |
2004 | 7760 | 0.0 | 0.0 | 0.0 |
2005 | 3163 | 0.0 | 0.0 | 0.0 |
2006 | 2285 | 0.0 | 0.0 | 0.0 |
2007 | 6214 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 3623 | 0.0 | 0.0 | 0.0 |
2010 | 1487 | 0.0 | 0.0 | 0.0 |
2011 | 229 | 0.0 | 0.0 | 0.0 |
2012 | 217 | 0.0 | 0.0 | 0.0 |
2013 | 306 | 0.0 | 0.0 | 0.0 |
2014 | 226 | 0.0 | 0.0 | 0.0 |
2015 | 1612 | 0.0 | 0.0 | 0.0 |
2016 | 252 | 0.0 | 0.0 | 0.0 |
2017 | 1761 | 0.0 | 0.0 | 0.0 |
2018 | 8619 | 0.0 | 0.0 | 0.0 |
2019 | 8598 | 0.0 | 0.0 | 0.0 |
2020 | 2004 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]