If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254262414000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.153628,"lon":-113.505479,"icon":""}]} |
Location: 00/14-24-025-26W4/0 | |
Location Alias: 00/14-24-25-26 W4M | |
Location Alias 2: 00/14-24-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 24 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 14-24-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0285031 | |
License Date: 2003-03-25 | |
License Status: Issued | |
Spud Date: 2003-07-16 | |
Final Drill Date: 2003-07-17 | |
Well Total Depth: 1016.00 m | |
Surface Hole Latitude: 51.153628 | |
Surface Hole Longitude: -113.505479 |
Date | Event |
---|---|
2003-03-25 | Obtained License |
2003-07-16 | Surface Casing Operation Performed |
2003-07-17 | Finished Drilling |
2003-07-17 | Production Casing Operation Performed |
2003-07-17 | Rig Released |
2003-07-17 | Well Mode changed to Drilled and Cased |
2003-08-27 | Well Log Performed |
2003-10-12 | Perforation Treatment Performed - Jet Perforation |
2004-04-28 | Well Began Production |
2004-04-28 | Well Fluid changed to Gas |
2004-04-28 | Well Mode changed to Flowing |
2010-11-15 | Perforation Treatment Performed - Jet Perforation |
2010-12-15 | Perforation Treatment Performed - Fractured |
2010-12-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-23 | Well Mode changed to Flowing |
2018-02-13 | Perforation Treatment Performed - Jet Perforation |
2018-02-13 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-10-12 | Perforation | 826.50 | 828.50 | 16 |
2010-11-15 | Perforation | 438.80 | 439.30 | 13 |
2010-11-15 | Perforation | 500.00 | 501.50 | 13 |
2010-11-15 | Perforation | 430.00 | 432.50 | 13 |
2010-11-15 | Perforation | 345.50 | 347.50 | 13 |
2010-11-15 | Perforation | 316.90 | 317.90 | 13 |
2010-11-15 | Perforation | 193.40 | 193.90 | 13 |
2010-11-15 | Perforation | 190.40 | 192.40 | 13 |
2010-11-15 | Perforation | 553.90 | 554.40 | 13 |
2010-11-15 | Perforation | 542.00 | 542.50 | 13 |
2010-11-15 | Perforation | 538.70 | 539.70 | 13 |
2003-10-12 | Perforation | 748.00 | 751.00 | 16 |
2010-11-15 | Perforation | 601.30 | 601.80 | 13 |
2010-11-15 | Perforation | 565.50 | 566.50 | 13 |
2010-11-15 | Perforation | 560.90 | 561.90 | 13 |
2010-11-15 | Perforation | 454.40 | 454.90 | 13 |
2010-11-15 | Perforation | 473.80 | 474.80 | 13 |
2010-11-15 | Perforation | 470.50 | 471.00 | 13 |
2010-11-15 | Perforation | 530.70 | 531.20 | 13 |
2010-11-15 | Perforation | 518.20 | 518.70 | 13 |
2010-11-15 | Perforation | 496.50 | 498.50 | 13 |
2010-12-15 | Fracture | 345.50 | 501.50 | 0 |
2003-10-12 | Perforation | 682.00 | 685.00 | 16 |
2010-12-15 | Fracture | 316.90 | 601.80 | 0 |
2018-02-13 | Perforation | 260.00 | 261.00 | 13 |
2018-02-13 | Perforation | 301.00 | 302.00 | 13 |
2018-02-13 | Perforation | 304.00 | 307.00 | 13 |
2018-02-13 | Perforation | 490.00 | 491.00 | 13 |
2018-02-13 | Perforation | 493.50 | 494.50 | 13 |
2018-02-13 | Perforation | 652.00 | 653.00 | 13 |
2018-02-13 | Perforation | 658.50 | 660.50 | 13 |
2003-10-12 | Perforation | 671.00 | 674.00 | 16 |
2010-11-15 | Perforation | 433.90 | 434.40 | 13 |
2010-11-15 | Perforation | 426.80 | 427.30 | 13 |
2010-11-15 | Perforation | 422.40 | 422.90 | 13 |
2010-11-15 | Perforation | 449.80 | 450.30 | 13 |
2010-11-15 | Perforation | 448.40 | 448.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 5880 | 0.0 | 0.0 | 0.0 |
2005 | 8141 | 0.0 | 0.0 | 0.0 |
2006 | 8715 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 8709 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8567 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]