If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254262405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.141952,"lon":-113.503468,"icon":""}]} |
Location: 00/05-24-025-26W4/0 | |
Location Alias: 00/05-24-25-26 W4M | |
Location Alias 2: 00/05-24-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 24 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-24-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412352 | |
License Date: 2009-09-16 | |
License Status: Issued | |
Spud Date: 2009-12-07 | |
Final Drill Date: 2009-12-09 | |
Well Total Depth: 1152.00 m | |
Surface Hole Latitude: 51.141952 | |
Surface Hole Longitude: -113.503468 |
Date | Event |
---|---|
2009-09-16 | Obtained License |
2009-12-07 | Direction Drilling Operation Performed - Deviate |
2009-12-08 | Surface Casing Operation Performed |
2009-12-09 | Finished Drilling |
2009-12-09 | Production Casing Operation Performed |
2009-12-09 | Rig Released |
2009-12-09 | Well Mode changed to Drilled and Cased |
2009-12-15 | Well Log Performed |
2010-01-19 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Perforation Treatment Performed - Fractured |
2010-02-05 | Well Fluid changed to Gas |
2010-02-05 | Well Mode changed to Testing |
2010-02-13 | Perforation Treatment Performed - Jet Perforation |
2010-03-25 | Well Began Production |
2010-03-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-03-25 | Well Mode changed to Flowing |
2010-05-14 | Perforation Treatment Performed - Fractured |
2010-08-20 | Well Log Performed |
2018-02-15 | Perforation Treatment Performed - Jet Perforation |
2018-02-15 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-07 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-19 | Perforation | 1081.00 | 1085.50 | 13 |
2010-02-13 | Perforation | 772.60 | 773.10 | 13 |
2010-02-13 | Perforation | 767.40 | 767.90 | 13 |
2010-02-13 | Perforation | 727.40 | 727.90 | 13 |
2010-02-13 | Perforation | 722.70 | 723.70 | 13 |
2010-02-13 | Perforation | 712.00 | 712.50 | 13 |
2010-02-13 | Perforation | 691.30 | 691.80 | 13 |
2010-02-13 | Perforation | 687.50 | 689.50 | 13 |
2010-02-13 | Perforation | 659.50 | 660.00 | 13 |
2010-02-13 | Perforation | 632.60 | 636.60 | 13 |
2010-02-13 | Perforation | 614.10 | 616.10 | 13 |
2010-01-19 | Perforation | 872.50 | 879.50 | 13 |
2010-02-13 | Perforation | 609.60 | 610.10 | 13 |
2010-02-13 | Perforation | 580.30 | 581.30 | 13 |
2010-02-13 | Perforation | 573.50 | 574.50 | 13 |
2010-02-13 | Perforation | 570.50 | 571.00 | 13 |
2010-02-13 | Perforation | 565.30 | 565.80 | 13 |
2010-02-13 | Perforation | 564.00 | 564.50 | 13 |
2010-02-13 | Perforation | 560.00 | 560.50 | 13 |
2010-02-13 | Perforation | 550.70 | 551.20 | 13 |
2010-02-13 | Perforation | 544.80 | 545.30 | 13 |
2010-02-13 | Perforation | 471.70 | 472.20 | 13 |
2010-02-02 | Fracture | 1081.00 | 1085.50 | 0 |
2010-02-13 | Perforation | 406.90 | 407.90 | 13 |
2010-02-13 | Perforation | 400.30 | 400.80 | 13 |
2010-02-13 | Perforation | 381.00 | 381.50 | 13 |
2010-02-13 | Perforation | 306.30 | 306.80 | 13 |
2010-05-14 | Fracture | 277.50 | 842.80 | 0 |
2010-05-14 | Fracture | 306.30 | 773.10 | 0 |
2018-02-15 | Perforation | 437.00 | 438.00 | 13 |
2018-02-15 | Perforation | 446.00 | 447.00 | 13 |
2018-02-15 | Perforation | 450.00 | 451.00 | 13 |
2018-02-15 | Perforation | 554.80 | 555.80 | 13 |
2010-02-02 | Fracture | 872.50 | 879.50 | 0 |
2018-02-15 | Perforation | 854.30 | 855.80 | 13 |
2018-02-15 | Perforation | 863.10 | 864.10 | 13 |
2018-02-15 | Perforation | 920.00 | 922.00 | 13 |
2018-02-15 | Perforation | 991.00 | 993.00 | 13 |
2018-02-15 | Perforation | 1098.10 | 1100.10 | 13 |
2018-02-15 | Perforation | 1110.30 | 1111.30 | 13 |
2010-02-13 | Perforation | 841.80 | 842.80 | 13 |
2010-02-13 | Perforation | 591.80 | 593.80 | 13 |
2010-02-13 | Perforation | 588.50 | 591.50 | 13 |
2010-02-13 | Perforation | 454.50 | 457.50 | 13 |
2010-02-13 | Perforation | 277.50 | 279.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 6796 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]