X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262215020

Well Details

Well ID: 0254262215020
Loading map...
Location: 02/15-22-025-26W4/0
Location Alias: 02/15-22-25-26 W4M
Location Alias 2: 02/15-22-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 22
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 15-22-25-26
Operator Name: Ember Resources Inc.
License Number: 0313947
License Date: 2004-08-26
License Status: Issued
Spud Date: 2004-10-22
Final Drill Date: 2004-10-26
Well Total Depth: 755.00 m
Surface Hole Latitude: 51.151945
Surface Hole Longitude: -113.550303

For data sources see[1][2]

Well History

Date Event
2004-08-26 Obtained License
2004-10-22 Surface Casing Operation Performed
2004-10-26 Finished Drilling
2004-10-26 Production Casing Operation Performed
2004-10-26 Rig Released
2004-10-26 Well Mode changed to Drilled and Cased
2004-10-30 Well Log Performed
2004-11-13 Perforation Treatment Performed - Jet Perforation
2005-01-06 Perforation Treatment Performed - Fractured
2005-01-10 Well Fluid changed to Gas
2005-01-10 Well Mode changed to Testing
2005-03-18 Perforation Treatment Performed - Jet Perforation
2005-04-12 Perforation Treatment Performed - Fractured
2006-01-18 Well Began Production
2006-01-18 Well Fluid changed to Coalbed Methane-Coals and Other
2006-01-18 Well Mode changed to Flowing
2010-12-07 Perforation Treatment Performed - Jet Perforation
2010-12-11 Perforation Treatment Performed - Fractured
2011-02-02 Perforation Treatment Performed - Jet Perforation
2011-02-08 Perforation Treatment Performed - Fractured
2011-02-18 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-13 Perforation 710.50 712.50 14
2005-03-18 Perforation 544.10 544.60 13
2005-03-18 Perforation 525.60 526.10 13
2005-03-18 Perforation 522.30 522.80 13
2005-03-18 Perforation 500.50 501.00 13
2005-03-18 Perforation 494.10 494.60 13
2005-03-18 Perforation 478.20 478.70 13
2005-03-18 Perforation 473.40 473.90 13
2005-03-18 Perforation 472.10 472.60 13
2005-03-18 Perforation 468.90 469.40 13
2005-03-18 Perforation 467.80 468.30 13
2005-01-06 Fracture 710.50 712.50 0
2005-03-18 Perforation 460.10 460.60 13
2005-03-18 Perforation 456.30 456.80 13
2005-03-18 Perforation 451.50 452.00 13
2005-03-18 Perforation 354.10 354.60 13
2005-03-18 Perforation 344.20 344.70 13
2005-03-18 Perforation 263.30 263.80 13
2005-03-18 Perforation 220.10 220.60 13
2005-03-18 Perforation 218.80 219.30 13
2005-04-12 Fracture 218.80 628.90 0
2010-12-07 Perforation 554.50 556.50 13
2005-03-18 Perforation 628.40 628.90 13
2010-12-07 Perforation 237.50 240.50 13
2010-12-07 Perforation 204.50 206.50 13
2010-12-11 Fracture 554.50 556.50 0
2010-12-11 Fracture 237.50 240.50 0
2010-12-11 Fracture 204.50 206.50 0
2011-02-02 Perforation 465.00 466.00 13
2011-02-02 Perforation 186.00 188.50 13
2011-02-02 Perforation 268.00 269.00 13
2011-02-02 Perforation 356.50 358.50 13
2011-02-02 Perforation 378.50 380.50 13
2005-03-18 Perforation 595.40 595.90 13
2011-02-02 Perforation 181.00 182.00 13
2011-02-02 Perforation 415.00 417.00 13
2011-02-08 Fracture 237.50 240.50 0
2011-02-08 Fracture 465.00 466.00 0
2011-02-08 Fracture 356.50 417.00 0
2011-02-08 Fracture 268.00 269.00 0
2011-02-08 Fracture 451.50 460.60 0
2011-02-08 Fracture 467.80 526.10 0
2011-02-08 Fracture 559.70 595.90 0
2011-02-08 Fracture 344.20 354.60 0
2005-03-18 Perforation 592.10 592.60 13
2011-02-08 Fracture 628.40 628.90 0
2011-02-08 Fracture 218.80 220.60 0
2011-02-08 Fracture 263.30 263.80 0
2005-03-18 Perforation 588.20 588.70 13
2005-03-18 Perforation 580.90 581.40 13
2005-03-18 Perforation 567.00 567.50 13
2005-03-18 Perforation 559.70 560.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 8285 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8351 0.0 0.0 0.0
2011 7573 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References