X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254262007000

Well Details

Well ID: 0254262007000
Loading map...
Location: 00/07-20-025-26W4/0
Location Alias: 00/07-20-25-26 W4M
Location Alias 2: 00/07-20-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 20
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 7-20-25-26
Operator Name: Ember Resources Inc.
License Number: 0307706
License Date: 2004-04-28
License Status: Issued
Spud Date: 2004-10-06
Final Drill Date: 2004-10-20
Well Total Depth: 797.00 m
Surface Hole Latitude: 51.146177
Surface Hole Longitude: -113.596352

For data sources see[1][2]

Well History

Date Event
2004-04-28 Obtained License
2004-10-06 Surface Casing Operation Performed
2004-10-20 Finished Drilling
2004-10-20 Production Casing Operation Performed
2004-10-20 Rig Released
2004-10-20 Well Mode changed to Drilled and Cased
2004-10-30 Well Log Performed
2004-11-13 Perforation Treatment Performed - Jet Perforation
2005-01-05 Perforation Treatment Performed - Fractured
2005-01-07 Well Fluid changed to Gas
2005-01-07 Well Mode changed to Testing
2005-03-20 Perforation Treatment Performed - Jet Perforation
2005-03-20 Well Fluid changed to Gas
2005-03-20 Well Mode changed to Test Completed
2005-04-13 Perforation Treatment Performed - Fractured
2010-09-29 Perforation Treatment Performed - Jet Perforation
2010-10-06 Perforation Treatment Performed - Fractured
2017-03-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-13 Perforation 736.00 738.00 14
2005-03-20 Perforation 591.80 592.30 13
2005-03-20 Perforation 583.50 584.00 13
2005-03-20 Perforation 568.60 569.10 13
2005-03-20 Perforation 552.00 552.50 13
2005-03-20 Perforation 549.70 550.20 13
2005-03-20 Perforation 547.80 548.30 13
2005-03-20 Perforation 528.70 529.20 13
2005-03-20 Perforation 523.20 523.70 13
2005-03-20 Perforation 519.10 519.60 13
2005-03-20 Perforation 509.00 509.50 13
2005-01-05 Fracture 736.00 738.00 0
2005-03-20 Perforation 505.20 505.70 13
2005-03-20 Perforation 504.00 504.50 13
2005-03-20 Perforation 480.50 481.00 13
2005-03-20 Perforation 474.50 475.00 13
2005-03-20 Perforation 415.10 415.60 13
2005-03-20 Perforation 374.80 375.30 13
2005-03-20 Perforation 363.10 363.60 13
2005-03-20 Perforation 341.10 341.60 13
2005-03-20 Perforation 234.90 235.40 13
2005-03-20 Perforation 228.00 228.50 13
2005-03-20 Perforation 650.50 651.00 13
2005-03-20 Perforation 226.70 227.20 13
2005-04-13 Fracture 226.70 651.00 0
2010-09-29 Perforation 483.00 485.00 13
2010-09-29 Perforation 421.00 423.00 13
2010-09-29 Perforation 307.50 310.50 13
2010-09-29 Perforation 255.00 257.00 13
2010-09-29 Perforation 232.00 233.50 13
2010-10-06 Fracture 232.00 485.00 0
2005-03-20 Perforation 618.80 619.30 13
2005-03-20 Perforation 615.40 615.90 13
2005-03-20 Perforation 614.70 615.20 13
2005-03-20 Perforation 606.60 607.10 13
2005-03-20 Perforation 594.70 595.20 13
2005-03-20 Perforation 593.60 594.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 48 0.0 0.0 0.0

For data sources see[5]

References