If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254262007000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.146177,"lon":-113.596352,"icon":""}]} |
Location: 00/07-20-025-26W4/0 | |
Location Alias: 00/07-20-25-26 W4M | |
Location Alias 2: 00/07-20-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 20 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-20-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0307706 | |
License Date: 2004-04-28 | |
License Status: Issued | |
Spud Date: 2004-10-06 | |
Final Drill Date: 2004-10-20 | |
Well Total Depth: 797.00 m | |
Surface Hole Latitude: 51.146177 | |
Surface Hole Longitude: -113.596352 |
Date | Event |
---|---|
2004-04-28 | Obtained License |
2004-10-06 | Surface Casing Operation Performed |
2004-10-20 | Finished Drilling |
2004-10-20 | Production Casing Operation Performed |
2004-10-20 | Rig Released |
2004-10-20 | Well Mode changed to Drilled and Cased |
2004-10-30 | Well Log Performed |
2004-11-13 | Perforation Treatment Performed - Jet Perforation |
2005-01-05 | Perforation Treatment Performed - Fractured |
2005-01-07 | Well Fluid changed to Gas |
2005-01-07 | Well Mode changed to Testing |
2005-03-20 | Perforation Treatment Performed - Jet Perforation |
2005-03-20 | Well Fluid changed to Gas |
2005-03-20 | Well Mode changed to Test Completed |
2005-04-13 | Perforation Treatment Performed - Fractured |
2010-09-29 | Perforation Treatment Performed - Jet Perforation |
2010-10-06 | Perforation Treatment Performed - Fractured |
2017-03-31 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-13 | Perforation | 736.00 | 738.00 | 14 |
2005-03-20 | Perforation | 591.80 | 592.30 | 13 |
2005-03-20 | Perforation | 583.50 | 584.00 | 13 |
2005-03-20 | Perforation | 568.60 | 569.10 | 13 |
2005-03-20 | Perforation | 552.00 | 552.50 | 13 |
2005-03-20 | Perforation | 549.70 | 550.20 | 13 |
2005-03-20 | Perforation | 547.80 | 548.30 | 13 |
2005-03-20 | Perforation | 528.70 | 529.20 | 13 |
2005-03-20 | Perforation | 523.20 | 523.70 | 13 |
2005-03-20 | Perforation | 519.10 | 519.60 | 13 |
2005-03-20 | Perforation | 509.00 | 509.50 | 13 |
2005-01-05 | Fracture | 736.00 | 738.00 | 0 |
2005-03-20 | Perforation | 505.20 | 505.70 | 13 |
2005-03-20 | Perforation | 504.00 | 504.50 | 13 |
2005-03-20 | Perforation | 480.50 | 481.00 | 13 |
2005-03-20 | Perforation | 474.50 | 475.00 | 13 |
2005-03-20 | Perforation | 415.10 | 415.60 | 13 |
2005-03-20 | Perforation | 374.80 | 375.30 | 13 |
2005-03-20 | Perforation | 363.10 | 363.60 | 13 |
2005-03-20 | Perforation | 341.10 | 341.60 | 13 |
2005-03-20 | Perforation | 234.90 | 235.40 | 13 |
2005-03-20 | Perforation | 228.00 | 228.50 | 13 |
2005-03-20 | Perforation | 650.50 | 651.00 | 13 |
2005-03-20 | Perforation | 226.70 | 227.20 | 13 |
2005-04-13 | Fracture | 226.70 | 651.00 | 0 |
2010-09-29 | Perforation | 483.00 | 485.00 | 13 |
2010-09-29 | Perforation | 421.00 | 423.00 | 13 |
2010-09-29 | Perforation | 307.50 | 310.50 | 13 |
2010-09-29 | Perforation | 255.00 | 257.00 | 13 |
2010-09-29 | Perforation | 232.00 | 233.50 | 13 |
2010-10-06 | Fracture | 232.00 | 485.00 | 0 |
2005-03-20 | Perforation | 618.80 | 619.30 | 13 |
2005-03-20 | Perforation | 615.40 | 615.90 | 13 |
2005-03-20 | Perforation | 614.70 | 615.20 | 13 |
2005-03-20 | Perforation | 606.60 | 607.10 | 13 |
2005-03-20 | Perforation | 594.70 | 595.20 | 13 |
2005-03-20 | Perforation | 593.60 | 594.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]