X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254261612000

Well Details

Well ID: 0254261612000
Loading map...
Location: 00/12-16-025-26W4/0
Location Alias: 00/12-16-25-26 W4M
Location Alias 2: 00/12-16-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 16
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 12-16-25-26
Operator Name: Ember Resources Inc.
License Number: 0221553
License Date: 1999-02-16
License Status: Issued
Spud Date: 1999-02-25
Final Drill Date: 1999-02-26
Well Total Depth: 1054.00 m
Surface Hole Latitude: 51.134492
Surface Hole Longitude: -113.582577

For data sources see[1][2]

Well History

Date Event
1999-02-16 Obtained License
1999-02-26 Finished Drilling
1999-02-26 Production Casing Operation Performed
1999-02-26 Rig Released
1999-02-26 Well Mode changed to Drilled and Cased
1999-02-27 Well Log Performed
1999-03-04 Perforation Treatment Performed - Jet Perforation
1999-03-05 Perforation Treatment Performed - Fractured
2000-10-24 Well Began Production
2000-10-24 Well Fluid changed to Gas
2000-10-24 Well Mode changed to Flowing
2005-02-11 Well Log Performed
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-02-25 Perforation Treatment Performed - Fractured
2006-02-01 Well Fluid changed to Gas
2006-02-01 Well Mode changed to Suspended
2017-04-24 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-04 Perforation 717.00 720.00 7
2005-02-18 Perforation 589.20 589.70 13
2005-02-18 Perforation 575.70 576.20 13
2005-02-18 Perforation 567.10 567.60 13
2005-02-18 Perforation 550.80 551.30 13
2005-02-18 Perforation 532.80 533.30 13
2005-02-18 Perforation 530.00 530.50 13
2005-02-18 Perforation 516.50 517.00 13
2005-02-18 Perforation 512.90 513.40 13
2005-02-18 Perforation 511.50 512.00 13
2005-02-18 Perforation 508.10 508.60 13
1999-03-05 Fracture 717.00 720.00 0
2005-02-18 Perforation 506.90 507.40 13
2005-02-18 Perforation 493.30 493.80 13
2005-02-18 Perforation 487.10 487.60 13
2005-02-18 Perforation 485.40 485.90 13
2005-02-18 Perforation 481.00 481.50 13
2005-02-18 Perforation 464.40 464.90 13
2005-02-18 Perforation 461.90 462.40 13
2005-02-18 Perforation 444.50 445.00 13
2005-02-18 Perforation 443.70 444.20 13
2005-02-18 Perforation 350.40 350.90 13
2005-02-18 Perforation 659.50 660.00 13
2005-02-18 Perforation 340.70 341.20 13
2005-02-18 Perforation 337.20 337.70 13
2005-02-18 Perforation 331.80 332.30 13
2005-02-18 Perforation 307.70 308.20 13
2005-02-18 Perforation 297.20 297.70 13
2005-02-18 Perforation 227.60 228.10 13
2005-02-18 Perforation 220.50 221.00 13
2005-02-18 Perforation 218.50 219.00 13
2005-02-18 Perforation 217.10 217.60 13
2005-02-25 Fracture 217.00 660.00 0
2005-02-18 Perforation 646.60 647.10 13
2005-02-18 Perforation 638.50 639.00 13
2005-02-18 Perforation 633.80 634.30 13
2005-02-18 Perforation 616.60 617.10 13
2005-02-18 Perforation 603.50 604.00 13
2005-02-18 Perforation 599.30 599.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 24 0.0 0.0 0.0
2000 1616 0.0 0.0 0.0
2001 8714 0.0 0.0 0.0
2002 8758 0.0 0.0 0.0
2003 8714 0.0 0.0 0.0
2004 8738 0.0 0.0 0.0
2005 3929 0.0 0.0 0.0
2006 705 0.0 0.0 0.0

For data sources see[5]

References