X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254261515020

Well Details

Well ID: 0254261515020
Loading map...
Location: 02/15-15-025-26W4/0
Location Alias: 02/15-15-25-26 W4M
Location Alias 2: 02/15-15-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 15
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 15-15-25-26
Operator Name: Ember Resources Inc.
License Number: 0286638
License Date: 2003-05-02
License Status: Amended
Spud Date: 2003-06-27
Final Drill Date: 2003-06-28
Well Total Depth: 847.00 m
Surface Hole Latitude: 51.134613
Surface Hole Longitude: -113.546751

For data sources see[1][2]

Well History

Date Event
2003-05-02 Obtained License
2003-06-14 Conductor Casing Operation Performed
2003-06-27 Direction Drilling Operation Performed - Deviate
2003-06-28 Finished Drilling
2003-06-28 Production Casing Operation Performed
2003-06-28 Rig Released
2003-06-28 Well Mode changed to Drilled and Cased
2003-07-15 Well Log Performed
2003-08-15 Perforation Treatment Performed - Jet Perforation
2003-08-26 Perforation Treatment Performed - Fractured
2003-11-13 Well Began Production
2003-11-13 Well Fluid changed to Coalbed Methane-Coals Only
2003-11-13 Well Mode changed to Flowing
2009-11-23 Perforation Treatment Performed - Fractured
2010-01-15 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-06-27 86.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-15 Perforation 747.60 748.60 13
2003-08-15 Perforation 622.10 623.10 13
2003-08-15 Perforation 595.50 596.50 13
2003-08-15 Perforation 594.00 595.00 13
2003-08-15 Perforation 591.50 593.50 13
2003-08-15 Perforation 569.70 571.70 13
2003-08-15 Perforation 564.50 565.50 13
2003-08-15 Perforation 559.60 560.60 13
2003-08-15 Perforation 537.70 538.70 13
2003-08-15 Perforation 533.60 534.60 13
2003-08-15 Perforation 531.80 532.80 13
2003-08-15 Perforation 740.30 741.30 13
2003-08-15 Perforation 527.20 528.20 13
2003-08-15 Perforation 519.00 520.00 13
2003-08-15 Perforation 505.90 506.90 13
2003-08-15 Perforation 503.10 504.10 13
2003-08-15 Perforation 498.30 499.30 13
2003-08-15 Perforation 474.00 475.00 13
2003-08-15 Perforation 360.40 361.40 13
2003-08-15 Perforation 351.60 352.60 13
2003-08-15 Perforation 331.00 332.00 13
2003-08-15 Perforation 294.30 295.30 13
2003-08-15 Perforation 698.50 699.50 13
2003-08-15 Perforation 215.20 217.20 13
2003-08-26 Fracture 215.20 748.60 0
2009-11-23 Fracture 215.20 748.60 0
2003-08-15 Perforation 696.20 697.20 13
2003-08-15 Perforation 692.10 693.10 13
2003-08-15 Perforation 680.60 681.60 13
2003-08-15 Perforation 662.20 664.20 13
2003-08-15 Perforation 658.90 660.90 13
2003-08-15 Perforation 648.30 649.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1164 0.0 0.0 0.0
2004 8064 0.0 0.0 0.0
2005 8141 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References