If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254261402003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.132042,"lon":-113.527079,"icon":""}]} |
Location: 00/02-14-025-26W4/3 | |
Location Alias: 00/02-14-25-26 W4M | |
Location Alias 2: 00/02-14-025-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 14 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-14-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0413453 | |
License Date: 2009-10-27 | |
License Status: Issued | |
Spud Date: 2009-12-01 | |
Final Drill Date: 2009-12-02 | |
Well Total Depth: 1126.00 m | |
Surface Hole Latitude: 51.132042 | |
Surface Hole Longitude: -113.527079 |
Date | Event |
---|---|
2009-10-27 | Obtained License |
2009-12-01 | Direction Drilling Operation Performed - Deviate |
2009-12-02 | Finished Drilling |
2009-12-02 | Surface Casing Operation Performed |
2009-12-02 | Well Mode changed to Drilled and Cased |
2009-12-03 | Production Casing Operation Performed |
2009-12-03 | Rig Released |
2009-12-08 | Well Log Performed |
2010-01-06 | Perforation Treatment Performed - Jet Perforation |
2010-01-12 | Perforation Treatment Performed - Fractured |
2010-01-25 | Well Began Production |
2010-01-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-01-25 | Well Mode changed to Flowing |
2017-03-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-13 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-01 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-06 | Perforation | 545.50 | 546.50 | 13 |
2010-01-06 | Perforation | 377.60 | 378.10 | 13 |
2010-01-06 | Perforation | 234.40 | 236.40 | 13 |
2010-01-06 | Perforation | 289.50 | 290.00 | 13 |
2010-01-06 | Perforation | 512.10 | 514.10 | 13 |
2010-01-06 | Perforation | 535.90 | 536.40 | 13 |
2010-01-06 | Perforation | 385.80 | 386.80 | 13 |
2010-01-06 | Perforation | 489.90 | 490.40 | 13 |
2010-01-06 | Perforation | 646.60 | 647.10 | 13 |
2010-01-06 | Perforation | 939.50 | 940.50 | 13 |
2010-01-06 | Perforation | 527.50 | 530.50 | 13 |
2010-01-06 | Perforation | 565.80 | 566.30 | 13 |
2010-01-06 | Perforation | 619.50 | 621.50 | 13 |
2010-01-06 | Perforation | 389.30 | 390.30 | 13 |
2010-01-06 | Perforation | 319.50 | 322.50 | 13 |
2010-01-06 | Perforation | 722.60 | 723.10 | 13 |
2010-01-06 | Perforation | 671.50 | 672.50 | 13 |
2010-01-06 | Perforation | 668.90 | 669.90 | 13 |
2010-01-06 | Perforation | 661.30 | 661.80 | 13 |
2010-01-06 | Perforation | 717.20 | 718.20 | 13 |
2010-01-06 | Perforation | 678.20 | 678.70 | 13 |
2010-01-12 | Fracture | 234.40 | 723.10 | 0 |
2010-01-06 | Perforation | 539.50 | 540.00 | 13 |
2010-01-12 | Fracture | 939.50 | 940.50 | 0 |
2010-01-12 | Fracture | 389.30 | 390.30 | 0 |
2010-01-12 | Fracture | 319.50 | 322.50 | 0 |
2010-01-12 | Fracture | 619.50 | 621.50 | 0 |
2010-01-12 | Fracture | 527.50 | 530.50 | 0 |
2010-01-06 | Perforation | 541.50 | 542.00 | 13 |
2010-01-06 | Perforation | 614.40 | 614.90 | 13 |
2010-01-06 | Perforation | 643.20 | 644.20 | 13 |
2010-01-06 | Perforation | 571.10 | 573.10 | 13 |
2010-01-06 | Perforation | 588.60 | 591.60 | 13 |
2010-01-06 | Perforation | 356.70 | 357.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 8183 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]