If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254261314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.139253,"lon":-113.518947,"icon":""}]} |
Location: 00/14-13-025-26W4/0 | |
Location Alias: 00/14-13-25-26 W4M | |
Location Alias 2: 00/14-13-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 13 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 14-13-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411990 | |
License Date: 2009-08-26 | |
License Status: Issued | |
Spud Date: 2009-12-12 | |
Final Drill Date: 2009-12-14 | |
Well Total Depth: 1270.00 m | |
Surface Hole Latitude: 51.139253 | |
Surface Hole Longitude: -113.518947 |
Date | Event |
---|---|
2009-08-26 | Obtained License |
2009-12-13 | Direction Drilling Operation Performed - Deviate |
2009-12-13 | Surface Casing Operation Performed |
2009-12-14 | Finished Drilling |
2009-12-14 | Well Mode changed to Drilled and Cased |
2009-12-17 | Production Casing Operation Performed |
2009-12-17 | Rig Released |
2009-12-23 | Well Log Performed |
2010-02-04 | Perforation Treatment Performed - Jet Perforation |
2010-02-19 | Perforation Treatment Performed - Fractured |
2010-03-09 | Well Fluid changed to Gas |
2010-03-09 | Well Mode changed to Testing |
2010-08-20 | Perforation Treatment Performed - Jet Perforation |
2010-08-24 | Perforation Treatment Performed - Fractured |
2010-09-01 | Well Began Production |
2010-09-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-13 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-04 | Perforation | 1058.00 | 1061.00 | 13 |
2010-08-20 | Perforation | 650.60 | 651.60 | 13 |
2010-08-20 | Perforation | 658.20 | 661.20 | 13 |
2010-08-20 | Perforation | 625.40 | 626.40 | 13 |
2010-08-20 | Perforation | 644.70 | 645.20 | 13 |
2010-08-20 | Perforation | 602.50 | 603.50 | 13 |
2010-08-20 | Perforation | 414.30 | 416.30 | 13 |
2010-08-20 | Perforation | 421.80 | 422.30 | 13 |
2010-08-20 | Perforation | 373.30 | 374.30 | 13 |
2010-08-20 | Perforation | 381.30 | 381.80 | 13 |
2010-08-20 | Perforation | 580.10 | 581.10 | 13 |
2010-02-04 | Perforation | 953.50 | 956.50 | 13 |
2010-08-20 | Perforation | 589.40 | 590.40 | 13 |
2010-08-20 | Perforation | 593.40 | 593.90 | 13 |
2010-08-20 | Perforation | 582.20 | 583.20 | 13 |
2010-08-20 | Perforation | 584.80 | 586.80 | 13 |
2010-08-20 | Perforation | 858.90 | 859.90 | 13 |
2010-08-20 | Perforation | 869.90 | 870.40 | 13 |
2010-08-20 | Perforation | 794.00 | 796.00 | 13 |
2010-08-20 | Perforation | 799.00 | 800.00 | 13 |
2010-08-20 | Perforation | 220.00 | 223.00 | 13 |
2010-08-20 | Perforation | 489.00 | 491.50 | 13 |
2010-02-19 | Fracture | 1058.00 | 1061.00 | 0 |
2010-08-20 | Perforation | 886.00 | 888.50 | 13 |
2010-08-20 | Perforation | 326.50 | 328.00 | 13 |
2010-08-20 | Perforation | 333.80 | 335.80 | 13 |
2010-08-20 | Perforation | 736.40 | 737.40 | 13 |
2010-08-20 | Perforation | 747.70 | 749.70 | 13 |
2010-08-20 | Perforation | 714.40 | 715.40 | 13 |
2010-08-20 | Perforation | 681.10 | 685.10 | 13 |
2010-08-20 | Perforation | 706.40 | 706.90 | 13 |
2010-08-20 | Perforation | 785.00 | 788.00 | 13 |
2010-08-20 | Perforation | 776.20 | 777.20 | 13 |
2010-02-19 | Fracture | 953.50 | 956.50 | 0 |
2010-08-20 | Perforation | 772.50 | 773.50 | 13 |
2010-08-20 | Perforation | 753.50 | 754.50 | 13 |
2010-08-24 | Fracture | 373.30 | 870.40 | 0 |
2010-08-24 | Fracture | 326.50 | 888.50 | 0 |
2010-08-20 | Perforation | 614.80 | 615.80 | 13 |
2010-08-20 | Perforation | 616.20 | 616.70 | 13 |
2010-08-20 | Perforation | 604.20 | 604.70 | 13 |
2010-08-20 | Perforation | 611.00 | 611.50 | 13 |
2010-08-20 | Perforation | 619.60 | 620.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2952 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8703 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8594 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]