If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254260916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.124742,"lon":-113.566461,"icon":""}]} |
Location: 00/16-09-025-26W4/0 | |
Location Alias: 00/16-09-25-26 W4M | |
Location Alias 2: 00/16-09-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-9-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0236333 | |
License Date: 2000-04-19 | |
License Status: Amended | |
Spud Date: 2000-05-31 | |
Final Drill Date: 2000-06-01 | |
Well Total Depth: 1040.00 m | |
Surface Hole Latitude: 51.124742 | |
Surface Hole Longitude: -113.566461 |
Date | Event |
---|---|
2000-04-19 | Obtained License |
2000-06-01 | Finished Drilling |
2000-06-01 | Surface Casing Operation Performed |
2000-06-02 | Production Casing Operation Performed |
2000-06-02 | Rig Released |
2000-06-02 | Well Mode changed to Drilled and Cased |
2000-06-27 | Well Log Performed |
2000-07-17 | Perforation Treatment Performed - Jet Perforation |
2000-08-09 | Perforation Treatment Performed - Fractured |
2000-10-24 | Well Began Production |
2000-10-24 | Well Fluid changed to Gas |
2000-10-24 | Well Mode changed to Flowing |
2009-02-08 | Perforation Treatment Performed - Jet Perforation |
2009-02-12 | Perforation Treatment Performed - Fractured |
2009-03-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-07-17 | Perforation | 876.00 | 879.00 | 7 |
2009-02-08 | Perforation | 451.80 | 452.30 | 14 |
2009-02-08 | Perforation | 341.90 | 342.40 | 14 |
2009-02-08 | Perforation | 208.00 | 210.00 | 14 |
2009-02-08 | Perforation | 278.40 | 278.90 | 14 |
2009-02-08 | Perforation | 544.00 | 546.00 | 14 |
2009-02-08 | Perforation | 206.20 | 206.70 | 14 |
2009-02-08 | Perforation | 333.10 | 333.60 | 14 |
2009-02-08 | Perforation | 340.10 | 341.10 | 14 |
2009-02-08 | Perforation | 288.40 | 288.90 | 14 |
2009-02-08 | Perforation | 321.40 | 321.90 | 14 |
2000-08-09 | Fracture | 876.00 | 879.00 | 0 |
2009-02-08 | Perforation | 472.30 | 472.80 | 14 |
2009-02-08 | Perforation | 587.40 | 587.90 | 14 |
2009-02-08 | Perforation | 589.50 | 590.50 | 14 |
2009-02-08 | Perforation | 566.30 | 568.30 | 14 |
2009-02-08 | Perforation | 579.70 | 580.70 | 14 |
2009-02-08 | Perforation | 634.70 | 635.20 | 14 |
2009-02-08 | Perforation | 636.90 | 637.40 | 14 |
2009-02-08 | Perforation | 594.10 | 594.60 | 14 |
2009-02-08 | Perforation | 628.80 | 629.30 | 14 |
2009-02-08 | Perforation | 539.10 | 539.60 | 14 |
2009-02-08 | Perforation | 353.40 | 354.40 | 14 |
2009-02-08 | Perforation | 479.40 | 479.90 | 14 |
2009-02-08 | Perforation | 481.80 | 482.30 | 14 |
2009-02-08 | Perforation | 474.60 | 475.10 | 14 |
2009-02-08 | Perforation | 476.20 | 476.70 | 14 |
2009-02-08 | Perforation | 503.40 | 505.40 | 14 |
2009-02-08 | Perforation | 518.30 | 521.30 | 14 |
2009-02-08 | Perforation | 495.40 | 495.90 | 14 |
2009-02-08 | Perforation | 499.00 | 499.50 | 14 |
2009-02-12 | Fracture | 544.00 | 546.00 | 0 |
2009-02-12 | Fracture | 206.20 | 637.40 | 0 |
2009-02-08 | Perforation | 355.00 | 357.00 | 14 |
2009-02-08 | Perforation | 343.60 | 345.60 | 14 |
2009-02-08 | Perforation | 347.90 | 349.90 | 14 |
2009-02-08 | Perforation | 453.70 | 455.70 | 14 |
2009-02-08 | Perforation | 467.30 | 467.80 | 14 |
2009-02-08 | Perforation | 434.50 | 435.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1616 | 0.0 | 0.0 | 0.0 |
2001 | 8714 | 0.0 | 0.0 | 0.0 |
2002 | 8758 | 0.0 | 0.0 | 0.0 |
2003 | 8714 | 0.0 | 0.0 | 0.0 |
2004 | 8738 | 0.0 | 0.0 | 0.0 |
2005 | 8141 | 0.0 | 0.0 | 0.0 |
2006 | 8715 | 0.0 | 0.0 | 0.0 |
2007 | 8732 | 0.0 | 0.0 | 0.0 |
2008 | 8709 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8735 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]