X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254260809000

Well Details

Well ID: 0254260809000
Loading map...
Location: 00/09-08-025-26W4/0
Location Alias: 00/09-08-25-26 W4M
Location Alias 2: 00/09-08-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 08
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-8-25-26
Operator Name: Ember Resources Inc.
License Number: 0345595
License Date: 2005-12-15
License Status: Amended
Spud Date: 2006-01-23
Final Drill Date: 2006-01-24
Well Total Depth: 986.00 m
Surface Hole Latitude: 51.125824
Surface Hole Longitude: -113.597099

For data sources see[1][2]

Well History

Date Event
2005-12-15 Obtained License
2006-01-23 Direction Drilling Operation Performed - Deviate
2006-01-23 Surface Casing Operation Performed
2006-01-24 Finished Drilling
2006-01-24 Production Casing Operation Performed
2006-01-24 Rig Released
2006-01-24 Well Mode changed to Drilled and Cased
2006-01-28 Well Log Performed
2006-02-20 Perforation Treatment Performed - Jet Perforation
2006-03-22 Perforation Treatment Performed - Jet Perforation
2006-05-19 Perforation Treatment Performed - Fractured
2006-06-07 Well Began Production
2006-06-07 Well Fluid changed to Coalbed Methane-Coals and Other
2006-06-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-01-23 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-20 Perforation 935.00 936.00 13
2006-03-22 Perforation 717.50 718.00 13
2006-03-22 Perforation 697.60 698.10 13
2006-03-22 Perforation 695.50 696.00 13
2006-03-22 Perforation 693.00 693.50 13
2006-03-22 Perforation 673.80 674.30 13
2006-03-22 Perforation 672.70 673.20 13
2006-03-22 Perforation 666.50 667.00 13
2006-03-22 Perforation 661.80 662.30 13
2006-03-22 Perforation 644.50 645.00 13
2006-03-22 Perforation 638.30 638.80 13
2006-03-22 Perforation 822.50 823.00 13
2006-03-22 Perforation 633.40 633.90 13
2006-03-22 Perforation 627.10 627.60 13
2006-03-22 Perforation 618.00 618.50 13
2006-03-22 Perforation 614.20 615.20 13
2006-03-22 Perforation 477.00 477.50 13
2006-03-22 Perforation 474.80 475.30 13
2006-03-22 Perforation 467.10 467.60 13
2006-03-22 Perforation 461.60 462.10 13
2006-03-22 Perforation 454.00 454.50 13
2006-03-22 Perforation 449.00 449.50 13
2006-03-22 Perforation 800.70 801.20 13
2006-03-22 Perforation 444.70 445.20 13
2006-03-22 Perforation 438.10 438.60 13
2006-03-22 Perforation 434.80 435.30 13
2006-03-22 Perforation 409.40 409.90 13
2006-03-22 Perforation 305.00 305.50 13
2006-03-22 Perforation 289.30 289.80 13
2006-05-19 Fracture 289.30 823.00 0
2006-03-22 Perforation 776.00 776.50 13
2006-03-22 Perforation 772.00 772.50 13
2006-03-22 Perforation 763.00 763.50 13
2006-03-22 Perforation 750.70 751.20 13
2006-03-22 Perforation 749.50 750.00 13
2006-03-22 Perforation 748.30 748.80 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4992 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8593 0.0 0.0 0.0
2015 8677 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References