If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254260610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.104296,"lon":-113.619661,"icon":""}]} |
Location: 00/10-06-025-26W4/0 | |
Location Alias: 00/10-06-25-26 W4M | |
Location Alias 2: 00/10-06-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 10-6-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0309672 | |
License Date: 2004-06-03 | |
License Status: Issued | |
Spud Date: 2004-10-04 | |
Final Drill Date: 2004-10-06 | |
Well Total Depth: 790.00 m | |
Surface Hole Latitude: 51.104296 | |
Surface Hole Longitude: -113.619661 |
Date | Event |
---|---|
2004-06-03 | Obtained License |
2004-10-05 | Surface Casing Operation Performed |
2004-10-06 | Finished Drilling |
2004-10-06 | Production Casing Operation Performed |
2004-10-06 | Rig Released |
2004-10-06 | Well Mode changed to Drilled and Cased |
2004-10-20 | Well Log Performed |
2005-02-08 | Perforation Treatment Performed - Jet Perforation |
2005-02-19 | Perforation Treatment Performed - Fractured |
2005-02-23 | Well Fluid changed to Gas |
2005-02-23 | Well Mode changed to Testing |
2005-05-05 | Perforation Treatment Performed - Jet Perforation |
2005-05-05 | Well Fluid changed to Gas |
2005-05-05 | Well Mode changed to Test Completed |
2005-05-20 | Perforation Treatment Performed - Fractured |
2010-07-09 | Perforation Treatment Performed - Jet Perforation |
2010-08-19 | Perforation Treatment Performed - Fractured |
2017-03-31 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-08 | Perforation | 747.00 | 749.00 | 13 |
2005-05-05 | Perforation | 606.80 | 607.30 | 13 |
2005-05-05 | Perforation | 593.10 | 593.60 | 13 |
2005-05-05 | Perforation | 576.10 | 576.60 | 13 |
2005-05-05 | Perforation | 558.60 | 559.10 | 13 |
2005-05-05 | Perforation | 557.30 | 557.80 | 13 |
2005-05-05 | Perforation | 555.60 | 556.10 | 13 |
2005-05-05 | Perforation | 537.70 | 538.20 | 13 |
2005-05-05 | Perforation | 532.00 | 532.50 | 13 |
2005-05-05 | Perforation | 513.60 | 514.10 | 13 |
2005-05-05 | Perforation | 506.60 | 507.10 | 13 |
2005-02-08 | Perforation | 739.00 | 741.00 | 13 |
2005-05-05 | Perforation | 503.90 | 504.40 | 13 |
2005-05-05 | Perforation | 501.70 | 502.20 | 13 |
2005-05-05 | Perforation | 488.90 | 489.40 | 13 |
2005-05-05 | Perforation | 465.50 | 466.00 | 13 |
2005-05-05 | Perforation | 436.30 | 436.80 | 13 |
2005-05-05 | Perforation | 374.80 | 375.30 | 13 |
2005-05-05 | Perforation | 349.10 | 349.60 | 13 |
2005-05-05 | Perforation | 347.90 | 348.40 | 13 |
2005-05-05 | Perforation | 246.20 | 246.70 | 13 |
2005-05-05 | Perforation | 234.20 | 234.70 | 13 |
2005-02-19 | Fracture | 739.00 | 749.00 | 0 |
2005-05-20 | Fracture | 234.20 | 667.50 | 0 |
2010-07-09 | Perforation | 604.00 | 605.50 | 13 |
2010-07-09 | Perforation | 498.00 | 499.00 | 13 |
2010-07-09 | Perforation | 479.00 | 480.50 | 13 |
2010-07-09 | Perforation | 447.00 | 448.50 | 13 |
2010-07-09 | Perforation | 365.00 | 367.50 | 13 |
2010-07-09 | Perforation | 213.00 | 216.00 | 13 |
2010-08-19 | Fracture | 479.00 | 480.50 | 0 |
2010-08-19 | Fracture | 365.00 | 367.50 | 0 |
2010-08-19 | Fracture | 213.00 | 216.00 | 0 |
2005-05-05 | Perforation | 667.00 | 667.50 | 13 |
2005-05-05 | Perforation | 665.40 | 665.90 | 13 |
2005-05-05 | Perforation | 663.20 | 663.70 | 13 |
2005-05-05 | Perforation | 630.80 | 631.30 | 13 |
2005-05-05 | Perforation | 625.70 | 626.20 | 13 |
2005-05-05 | Perforation | 617.30 | 617.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]