If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254260307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.10286,"lon":-113.550603,"icon":""}]} |
Location: 00/07-03-025-26W4/0 | |
Location Alias: 00/07-03-25-26 W4M | |
Location Alias 2: 00/07-03-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 03 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 7-3-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0267154 | |
License Date: 2002-02-01 | |
License Status: Issued | |
Spud Date: 2002-02-06 | |
Final Drill Date: 2002-02-09 | |
Well Total Depth: 1025.00 m | |
Surface Hole Latitude: 51.102860 | |
Surface Hole Longitude: -113.550603 |
Date | Event |
---|---|
2002-02-01 | Obtained License |
2002-02-06 | Surface Casing Operation Performed |
2002-02-09 | Finished Drilling |
2002-02-09 | Production Casing Operation Performed |
2002-02-09 | Rig Released |
2002-02-09 | Well Mode changed to Drilled and Cased |
2002-03-19 | Well Log Performed |
2002-12-01 | Perforation Treatment Performed - Jet Perforation |
2002-12-14 | Perforation Treatment Performed - Fractured |
2010-01-28 | Well Began Production |
2010-01-28 | Well Fluid changed to Gas |
2010-01-28 | Well Mode changed to Flowing |
2011-08-09 | Perforation Treatment Performed - Jet Perforation |
2011-09-13 | Perforation Treatment Performed - Fractured |
2011-09-30 | Perforation Treatment Performed - Jet Perforation |
2011-10-22 | Perforation Treatment Performed - Fractured |
2011-11-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-06 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-12-01 | Perforation | 930.00 | 933.00 | 13 |
2002-12-14 | Fracture | 815.50 | 817.50 | 0 |
2002-12-14 | Fracture | 713.00 | 715.00 | 0 |
2002-12-14 | Fracture | 696.50 | 698.50 | 0 |
2011-08-09 | Perforation | 940.50 | 943.50 | 13 |
2011-08-09 | Perforation | 950.00 | 952.50 | 13 |
2011-09-13 | Fracture | 940.50 | 943.50 | 0 |
2011-09-13 | Fracture | 950.00 | 952.50 | 0 |
2011-09-30 | Perforation | 198.00 | 201.00 | 13 |
2011-09-30 | Perforation | 217.00 | 220.00 | 13 |
2011-09-30 | Perforation | 222.00 | 223.50 | 13 |
2002-12-01 | Perforation | 867.50 | 869.50 | 13 |
2011-09-30 | Perforation | 324.60 | 325.10 | 13 |
2011-09-30 | Perforation | 330.70 | 331.20 | 13 |
2011-09-30 | Perforation | 333.20 | 333.70 | 13 |
2011-09-30 | Perforation | 343.70 | 344.20 | 13 |
2011-09-30 | Perforation | 345.70 | 346.20 | 13 |
2011-09-30 | Perforation | 348.40 | 348.90 | 13 |
2011-09-30 | Perforation | 383.00 | 384.00 | 13 |
2011-09-30 | Perforation | 433.90 | 434.40 | 13 |
2011-09-30 | Perforation | 455.30 | 456.80 | 13 |
2011-09-30 | Perforation | 466.60 | 467.60 | 13 |
2002-12-01 | Perforation | 841.50 | 843.50 | 13 |
2011-09-30 | Perforation | 470.40 | 471.40 | 13 |
2011-09-30 | Perforation | 472.90 | 473.40 | 13 |
2011-09-30 | Perforation | 479.60 | 480.10 | 13 |
2011-09-30 | Perforation | 498.10 | 498.60 | 13 |
2011-09-30 | Perforation | 504.80 | 506.30 | 13 |
2011-09-30 | Perforation | 512.50 | 514.50 | 13 |
2011-09-30 | Perforation | 517.80 | 521.80 | 13 |
2011-09-30 | Perforation | 523.50 | 525.00 | 13 |
2011-09-30 | Perforation | 542.20 | 542.70 | 13 |
2011-09-30 | Perforation | 566.60 | 568.10 | 13 |
2002-12-01 | Perforation | 815.50 | 817.50 | 13 |
2011-09-30 | Perforation | 568.70 | 569.20 | 13 |
2011-09-30 | Perforation | 582.00 | 583.00 | 13 |
2011-09-30 | Perforation | 588.40 | 589.90 | 13 |
2011-09-30 | Perforation | 592.60 | 593.60 | 13 |
2011-09-30 | Perforation | 597.80 | 598.30 | 13 |
2011-09-30 | Perforation | 630.50 | 631.00 | 13 |
2011-09-30 | Perforation | 637.60 | 638.10 | 13 |
2011-09-30 | Perforation | 702.50 | 705.50 | 13 |
2011-09-30 | Perforation | 708.50 | 711.00 | 13 |
2011-10-22 | Fracture | 217.00 | 711.00 | 0 |
2002-12-01 | Perforation | 713.00 | 715.00 | 13 |
2002-12-01 | Perforation | 696.50 | 698.50 | 13 |
2002-12-14 | Fracture | 930.00 | 933.00 | 0 |
2002-12-14 | Fracture | 867.50 | 869.50 | 0 |
2002-12-14 | Fracture | 841.50 | 843.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 8015 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]