If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254260205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.107028,"lon":-113.538601,"icon":""}]} |
Location: 00/05-02-025-26W4/0 | |
Location Alias: 00/05-02-25-26 W4M | |
Location Alias 2: 00/05-02-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 02 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-2-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0429798 | |
License Date: 2011-01-12 | |
License Status: Issued | |
Spud Date: 2011-01-23 | |
Final Drill Date: 2011-01-24 | |
Well Total Depth: 1255.00 m | |
Surface Hole Latitude: 51.107028 | |
Surface Hole Longitude: -113.538601 |
Date | Event |
---|---|
2011-01-12 | Obtained License |
2011-01-23 | Direction Drilling Operation Performed - Deviate |
2011-01-23 | Surface Casing Operation Performed |
2011-01-24 | Finished Drilling |
2011-01-24 | Well Mode changed to Drilled and Cased |
2011-01-25 | Production Casing Operation Performed |
2011-01-25 | Rig Released |
2011-01-30 | Well Log Performed |
2011-02-24 | Perforation Treatment Performed - Jet Perforation |
2011-09-25 | Perforation Treatment Performed - Fractured |
2011-09-28 | Well Fluid changed to Gas |
2011-09-28 | Well Mode changed to Testing |
2011-10-15 | Perforation Treatment Performed - Jet Perforation |
2011-11-10 | Well Began Production |
2011-11-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-10 | Well Mode changed to Flowing |
2016-06-15 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-23 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-24 | Perforation | 1191.00 | 1193.00 | 13 |
2011-09-25 | Fracture | 912.00 | 914.00 | 0 |
2011-09-25 | Fracture | 1191.00 | 1193.00 | 0 |
2011-10-15 | Perforation | 284.80 | 286.30 | 13 |
2011-10-15 | Perforation | 379.80 | 380.30 | 13 |
2011-10-15 | Perforation | 419.90 | 420.90 | 13 |
2011-10-15 | Perforation | 420.90 | 421.40 | 13 |
2011-10-15 | Perforation | 428.70 | 429.20 | 13 |
2011-10-15 | Perforation | 433.00 | 433.50 | 13 |
2011-10-15 | Perforation | 435.50 | 436.00 | 13 |
2011-10-15 | Perforation | 445.00 | 447.00 | 13 |
2011-02-24 | Perforation | 912.00 | 914.00 | 13 |
2011-10-15 | Perforation | 460.50 | 463.50 | 13 |
2011-10-15 | Perforation | 492.90 | 493.40 | 13 |
2011-10-15 | Perforation | 499.60 | 500.10 | 13 |
2011-10-15 | Perforation | 500.70 | 501.20 | 13 |
2011-10-15 | Perforation | 574.90 | 576.40 | 13 |
2011-10-15 | Perforation | 590.00 | 591.00 | 13 |
2011-10-15 | Perforation | 592.00 | 594.00 | 13 |
2011-10-15 | Perforation | 596.00 | 597.00 | 13 |
2011-10-15 | Perforation | 598.30 | 598.80 | 13 |
2011-10-15 | Perforation | 600.80 | 601.30 | 13 |
2011-02-24 | Perforation | 899.00 | 901.00 | 13 |
2011-10-15 | Perforation | 605.00 | 606.00 | 13 |
2011-10-15 | Perforation | 628.30 | 628.80 | 13 |
2011-10-15 | Perforation | 633.80 | 635.80 | 13 |
2011-10-15 | Perforation | 642.00 | 644.00 | 13 |
2011-10-15 | Perforation | 651.90 | 655.90 | 13 |
2011-10-15 | Perforation | 658.00 | 660.00 | 13 |
2011-10-15 | Perforation | 678.80 | 679.30 | 13 |
2011-10-15 | Perforation | 718.90 | 720.90 | 13 |
2011-10-15 | Perforation | 721.70 | 722.20 | 13 |
2011-10-15 | Perforation | 737.70 | 739.20 | 13 |
2011-02-24 | Perforation | 687.00 | 689.00 | 13 |
2011-10-15 | Perforation | 745.90 | 747.40 | 13 |
2011-10-15 | Perforation | 751.30 | 752.30 | 13 |
2011-10-15 | Perforation | 803.00 | 804.00 | 13 |
2011-10-15 | Perforation | 809.70 | 810.20 | 13 |
2011-10-15 | Perforation | 813.00 | 813.50 | 13 |
2011-02-24 | Perforation | 558.00 | 560.00 | 13 |
2011-02-24 | Perforation | 276.00 | 278.00 | 13 |
2011-09-25 | Fracture | 558.00 | 560.00 | 0 |
2011-09-25 | Fracture | 687.00 | 689.00 | 0 |
2011-09-25 | Fracture | 899.00 | 901.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1238 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8634 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8721 | 0.0 | 0.0 | 0.0 |
2016 | 8726 | 0.0 | 0.0 | 0.0 |
2017 | 8709 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8563 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]