X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254253603000

Well Details

Well ID: 0254253603000
Loading map...
Location: 00/03-36-025-25W4/0
Location Alias: 00/03-36-25-25 W4M
Location Alias 2: 00/03-36-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 36
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-36-25-25
Operator Name: Ember Resources Inc.
License Number: 0347366
License Date: 2006-01-04
License Status: Issued
Spud Date: 2006-01-11
Final Drill Date: 2006-01-15
Well Total Depth: 699.00 m
Surface Hole Latitude: 51.170853
Surface Hole Longitude: -113.367000

For data sources see[1][2]

Well History

Date Event
2006-01-04 Obtained License
2006-01-11 Surface Casing Operation Performed
2006-01-15 Finished Drilling
2006-01-15 Production Casing Operation Performed
2006-01-15 Rig Released
2006-01-15 Well Mode changed to Drilled and Cased
2006-01-20 Well Log Performed
2006-02-05 Perforation Treatment Performed - Jet Perforation
2006-02-06 Perforation Treatment Performed - Fractured
2006-06-26 Well Began Production
2006-06-26 Well Fluid changed to Coalbed Methane-Coals Only
2006-06-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-05 Perforation 560.20 560.70 13
2006-02-05 Perforation 446.80 447.30 13
2006-02-05 Perforation 446.10 446.60 13
2006-02-05 Perforation 441.60 442.10 13
2006-02-05 Perforation 423.60 424.10 13
2006-02-05 Perforation 414.40 414.90 13
2006-02-05 Perforation 412.10 412.60 13
2006-02-05 Perforation 411.40 411.90 13
2006-02-05 Perforation 399.00 399.50 13
2006-02-05 Perforation 396.00 396.50 13
2006-02-05 Perforation 394.90 395.40 13
2006-02-05 Perforation 525.00 525.50 13
2006-02-05 Perforation 392.30 392.80 13
2006-02-05 Perforation 388.40 388.90 13
2006-02-05 Perforation 377.70 378.20 13
2006-02-05 Perforation 374.90 375.40 13
2006-02-05 Perforation 374.40 374.90 13
2006-02-05 Perforation 321.90 322.40 13
2006-02-05 Perforation 281.40 281.90 13
2006-02-05 Perforation 267.40 267.90 13
2006-02-05 Perforation 265.40 265.90 13
2006-02-05 Perforation 255.90 256.40 13
2006-02-05 Perforation 523.50 524.00 13
2006-02-05 Perforation 244.70 245.20 13
2006-02-06 Fracture 244.70 560.70 0
2006-02-05 Perforation 518.30 518.80 13
2006-02-05 Perforation 517.40 517.90 13
2006-02-05 Perforation 511.80 512.30 13
2006-02-05 Perforation 502.40 502.90 13
2006-02-05 Perforation 494.60 495.10 13
2006-02-05 Perforation 493.90 494.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4313 0.0 0.0 0.0
2007 7866 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8764 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8730 0.0 0.0 0.0
2016 8710 0.0 0.0 0.0
2017 8540 0.0 0.0 0.0
2018 8704 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References