X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254253202000

Well Details

Well ID: 0254253202000
Loading map...
Location: 00/02-32-025-25W4/0
Location Alias: 00/02-32-25-25 W4M
Location Alias 2: 00/02-32-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 32
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-32-25-25
Operator Name: Ember Resources Inc.
License Number: 0313391
License Date: 2004-08-16
License Status: Issued
Spud Date: 2004-09-25
Final Drill Date: 2004-09-30
Well Total Depth: 941.00 m
Surface Hole Latitude: 51.170595
Surface Hole Longitude: -113.455240

For data sources see[1][2]

Well History

Date Event
2004-08-16 Obtained License
2004-09-25 Surface Casing Operation Performed
2004-09-30 Finished Drilling
2004-09-30 Well Mode changed to Drilled and Cased
2004-10-01 Production Casing Operation Performed
2004-10-01 Rig Released
2004-10-09 Well Log Performed
2004-11-05 Perforation Treatment Performed - Jet Perforation
2005-01-10 Perforation Treatment Performed - Fractured
2005-01-18 Well Fluid changed to Gas
2005-01-18 Well Mode changed to Testing
2005-06-14 Well Began Production
2005-06-14 Well Fluid changed to Gas
2005-06-14 Well Mode changed to Flowing
2009-12-12 Perforation Treatment Performed - Jet Perforation
2010-01-08 Perforation Treatment Performed - Fractured
2010-01-14 Well Fluid changed to Coalbed Methane-Coals and Other
2010-01-14 Well Mode changed to Flowing
2010-02-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-05 Perforation 887.00 890.00 13
2005-01-10 Fracture 651.50 653.50 0
2009-12-12 Perforation 405.70 406.20 13
2009-12-12 Perforation 295.10 295.60 13
2009-12-12 Perforation 420.80 421.30 13
2009-12-12 Perforation 434.20 434.70 13
2009-12-12 Perforation 426.90 427.40 13
2009-12-12 Perforation 327.00 328.00 13
2009-12-12 Perforation 308.00 309.00 13
2009-12-12 Perforation 366.00 367.00 13
2009-12-12 Perforation 288.80 289.30 13
2004-11-05 Perforation 867.00 870.00 13
2009-12-12 Perforation 485.00 486.00 13
2009-12-12 Perforation 544.30 546.30 13
2009-12-12 Perforation 540.50 541.00 13
2009-12-12 Perforation 551.50 552.00 13
2009-12-12 Perforation 589.20 589.70 13
2009-12-12 Perforation 554.10 554.60 13
2009-12-12 Perforation 472.40 473.40 13
2009-12-12 Perforation 456.90 457.40 13
2009-12-12 Perforation 449.60 450.10 13
2009-12-12 Perforation 524.40 525.40 13
2004-11-05 Perforation 801.00 804.00 13
2009-12-12 Perforation 478.00 479.00 13
2010-01-08 Fracture 327.00 328.00 0
2010-01-08 Fracture 308.00 309.00 0
2010-01-08 Fracture 366.00 367.00 0
2010-01-08 Fracture 288.80 589.70 0
2010-01-08 Fracture 485.00 486.00 0
2004-11-05 Perforation 723.00 727.00 13
2004-11-05 Perforation 668.00 671.00 13
2004-11-05 Perforation 651.50 653.50 13
2005-01-10 Fracture 867.00 870.00 0
2005-01-10 Fracture 801.00 804.00 0
2005-01-10 Fracture 668.00 671.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4365 0.0 0.0 0.0
2006 8706 0.0 0.0 0.0
2007 7179 0.0 0.0 0.0
2008 5448 0.0 0.0 0.0
2009 7498 0.0 0.0 0.0
2010 6267 0.0 0.0 0.0
2011 4096 0.0 0.0 0.0
2012 8561 0.0 0.0 0.0
2013 8555 0.0 0.0 0.0
2014 8151 0.0 0.0 0.0
2015 6157 0.0 0.0 0.0
2016 6528 0.0 0.0 0.0
2017 6381 0.0 0.0 0.0
2018 7799 0.0 0.0 0.0
2019 7953 0.0 0.0 0.0
2020 1546 0.0 0.0 0.0

For data sources see[5]

References