X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254252113002

Well Details

Well ID: 0254252113002
Loading map...
Location: 00/13-21-025-25W4/2
Location Alias: 00/13-21-25-25 W4M
Location Alias 2: 00/13-21-025-25 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 21
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 13-21-25-25
Operator Name: Ember Resources Inc.
License Number: 0285751
License Date: 2003-04-09
License Status: Issued
Spud Date: 2003-06-25
Final Drill Date: 2003-06-28
Well Total Depth: 984.00 m
Surface Hole Latitude: 51.152455
Surface Hole Longitude: -113.446081

For data sources see[1][2]

Well History

Date Event
2003-04-09 Obtained License
2003-06-26 Surface Casing Operation Performed
2003-06-28 Finished Drilling
2003-06-28 Production Casing Operation Performed
2003-06-28 Rig Released
2003-06-28 Well Mode changed to Drilled and Cased
2003-07-16 Well Log Performed
2003-08-15 Perforation Treatment Performed - Jet Perforation
2003-09-05 Perforation Treatment Performed - Jet Perforation
2003-09-12 Well Fluid changed to Gas
2003-09-12 Well Mode changed to Testing
2003-12-05 Well Structure changed to Commingled
2010-08-22 Perforation Treatment Performed - Jet Perforation
2010-08-25 Perforation Treatment Performed - Fractured
2011-03-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-15 Perforation 870.00 872.00 13
2010-08-22 Perforation 274.90 275.40 13
2010-08-22 Perforation 262.80 263.30 13
2010-08-22 Perforation 207.70 208.20 13
2010-08-22 Perforation 398.20 398.70 13
2010-08-22 Perforation 392.70 393.70 13
2010-08-22 Perforation 285.90 286.40 13
2010-08-22 Perforation 213.00 216.00 13
2010-08-22 Perforation 537.90 538.40 13
2010-08-22 Perforation 317.50 320.00 13
2010-08-22 Perforation 375.00 378.00 13
2003-08-15 Perforation 867.00 870.00 13
2010-08-22 Perforation 348.00 351.00 13
2010-08-22 Perforation 536.70 537.20 13
2010-08-22 Perforation 506.80 507.80 13
2010-08-22 Perforation 457.80 458.30 13
2010-08-22 Perforation 452.80 453.30 13
2010-08-22 Perforation 528.90 529.90 13
2010-08-22 Perforation 522.60 523.10 13
2010-08-25 Fracture 207.70 538.40 0
2010-08-25 Fracture 213.00 378.00 0
2003-09-05 Perforation 847.00 850.00 13
2010-08-22 Perforation 414.90 415.40 13
2010-08-22 Perforation 409.40 409.90 13
2010-08-22 Perforation 402.60 403.10 13
2010-08-22 Perforation 449.10 449.60 13
2010-08-22 Perforation 437.20 438.20 13
2010-08-22 Perforation 431.50 432.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 48 0.0 0.0 0.0

For data sources see[5]

References