X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254251912002

Well Details

Well ID: 0254251912002
Loading map...
Location: 00/12-19-025-25W4/2
Location Alias: 00/12-19-25-25 W4M
Location Alias 2: 00/12-19-025-25 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 19
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 12-19-25-25
Operator Name: Ember Resources Inc.
License Number: 0319253
License Date: 2004-11-18
License Status: Issued
Spud Date: 2005-01-19
Final Drill Date: 2005-01-26
Well Total Depth: 724.00 m
Surface Hole Latitude: 51.148163
Surface Hole Longitude: -113.490981

For data sources see[1][2]

Well History

Date Event
2004-11-18 Obtained License
2005-01-19 Surface Casing Operation Performed
2005-01-26 Finished Drilling
2005-01-26 Well Mode changed to Drilled and Cased
2005-01-27 Production Casing Operation Performed
2005-01-27 Rig Released
2005-01-30 Well Log Performed
2005-02-10 Perforation Treatment Performed - Jet Perforation
2005-03-23 Perforation Treatment Performed - Fractured
2005-04-30 Perforation Treatment Performed - Jet Perforation
2005-05-09 Perforation Treatment Performed - Fractured
2005-06-15 Well Began Production
2005-06-15 Well Fluid changed to Coalbed Methane-Coals Only
2005-06-15 Well Mode changed to Flowing
2010-11-26 Well Log Performed
2015-11-30 Well Log Performed
2017-04-04 Well Fluid changed to Coalbed Methane-Coals Only
2017-04-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-10 Perforation 672.00 674.00 13
2005-04-30 Perforation 545.80 546.30 13
2005-04-30 Perforation 531.60 532.10 13
2005-04-30 Perforation 528.70 529.20 13
2005-04-30 Perforation 527.40 527.90 13
2005-04-30 Perforation 519.30 519.80 13
2005-04-30 Perforation 505.10 505.60 13
2005-04-30 Perforation 481.50 482.00 13
2005-04-30 Perforation 464.60 465.10 13
2005-04-30 Perforation 460.60 461.10 13
2005-04-30 Perforation 456.10 456.60 13
2005-03-23 Fracture 672.00 674.00 0
2005-04-30 Perforation 440.00 440.50 13
2005-04-30 Perforation 437.50 438.00 13
2005-04-30 Perforation 425.70 426.20 13
2005-04-30 Perforation 414.50 415.00 13
2005-04-30 Perforation 413.30 413.80 13
2005-04-30 Perforation 411.90 412.40 13
2005-04-30 Perforation 393.00 393.50 13
2005-04-30 Perforation 364.20 364.70 13
2005-04-30 Perforation 312.20 312.70 13
2005-04-30 Perforation 306.90 307.40 13
2005-04-30 Perforation 600.90 601.40 13
2005-04-30 Perforation 228.30 228.80 13
2005-04-30 Perforation 185.80 186.30 13
2005-04-30 Perforation 183.00 183.50 13
2005-04-30 Perforation 175.20 175.70 13
2005-05-09 Fracture 175.20 601.40 0
2005-04-30 Perforation 597.30 597.80 13
2005-04-30 Perforation 594.60 595.10 13
2005-04-30 Perforation 589.50 590.00 13
2005-04-30 Perforation 557.40 557.90 13
2005-04-30 Perforation 556.00 556.50 13
2005-04-30 Perforation 551.30 551.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4241 0.0 0.0 0.0
2006 8715 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8709 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8725 0.0 0.0 0.0
2012 8714 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8656 0.0 0.0 0.0
2015 8721 0.0 0.0 0.0
2016 8726 0.0 0.0 0.0
2017 8709 0.0 0.0 0.0
2018 8718 0.0 0.0 0.0
2019 8563 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[5]

References