X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254251909000

Well Details

Well ID: 0254251909000
Loading map...
Location: 00/09-19-025-25W4/0
Location Alias: 00/09-19-25-25 W4M
Location Alias 2: 00/09-19-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 19
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-19-25-25
Operator Name: Ember Resources Inc.
License Number: 0325518
License Date: 2005-02-02
License Status: Issued
Spud Date: 2005-02-11
Final Drill Date: 2005-02-14
Well Total Depth: 699.00 m
Surface Hole Latitude: 51.147257
Surface Hole Longitude: -113.473153

For data sources see[1][2]

Well History

Date Event
2005-02-02 Obtained License
2005-02-11 Surface Casing Operation Performed
2005-02-14 Finished Drilling
2005-02-14 Production Casing Operation Performed
2005-02-14 Rig Released
2005-02-14 Well Mode changed to Drilled and Cased
2005-02-17 Well Log Performed
2005-03-24 Perforation Treatment Performed - Jet Perforation
2005-04-20 Perforation Treatment Performed - Fractured
2005-05-20 Well Began Production
2005-05-20 Well Fluid changed to Coalbed Methane-Coals Only
2005-05-20 Well Mode changed to Flowing
2008-01-16 Well Log Performed
2008-05-18 Well Log Performed
2009-06-18 Well Log Performed
2010-08-21 Perforation Treatment Performed - Jet Perforation
2010-08-22 Perforation Treatment Performed - Jet Perforation
2010-08-25 Perforation Treatment Performed - Fractured
2010-09-01 Well Structure changed to Commingled
2010-10-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-24 Perforation 579.20 579.70 13
2005-03-24 Perforation 502.90 503.40 13
2005-03-24 Perforation 487.90 488.40 13
2005-03-24 Perforation 464.80 465.30 13
2005-03-24 Perforation 459.30 459.80 13
2005-03-24 Perforation 444.90 445.40 13
2005-03-24 Perforation 442.30 442.80 13
2005-03-24 Perforation 441.20 441.70 13
2005-03-24 Perforation 437.10 437.60 13
2005-03-24 Perforation 423.00 423.50 13
2005-03-24 Perforation 418.90 419.40 13
2005-03-24 Perforation 540.20 540.70 13
2005-03-24 Perforation 411.60 412.10 13
2005-03-24 Perforation 398.10 398.60 13
2005-03-24 Perforation 397.10 397.60 13
2005-03-24 Perforation 377.40 377.90 13
2005-03-24 Perforation 291.30 291.80 13
2005-03-24 Perforation 282.50 283.00 13
2005-03-24 Perforation 242.20 242.70 13
2005-03-24 Perforation 234.80 235.30 13
2005-03-24 Perforation 212.40 212.90 13
2005-04-20 Fracture 212.40 579.70 0
2005-03-24 Perforation 538.50 539.00 13
2010-08-21 Perforation 661.00 663.00 13
2010-08-22 Perforation 316.00 319.00 13
2010-08-22 Perforation 321.00 323.00 13
2010-08-22 Perforation 311.00 313.00 13
2010-08-22 Perforation 185.00 188.00 13
2010-08-22 Perforation 295.00 298.00 13
2010-08-22 Perforation 493.00 495.00 13
2010-08-22 Perforation 645.00 648.00 13
2010-08-22 Perforation 360.00 362.00 13
2010-08-22 Perforation 467.50 469.50 13
2005-03-24 Perforation 534.20 534.70 13
2010-08-22 Perforation 401.00 403.00 13
2010-08-25 Fracture 295.00 663.00 0
2010-08-25 Fracture 234.80 579.70 0
2005-03-24 Perforation 532.90 533.40 13
2005-03-24 Perforation 526.80 527.30 13
2005-03-24 Perforation 515.40 515.90 13
2005-03-24 Perforation 512.40 512.90 13
2005-03-24 Perforation 511.20 511.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4965 0.0 0.0 0.0
2006 8656 0.0 0.0 0.0
2007 8732 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 5807 0.0 0.0 0.0

For data sources see[5]

References