If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254250605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.101258,"lon":-113.487439,"icon":""}]} |
Location: 00/05-06-025-25W4/0 | |
Location Alias: 00/05-06-25-25 W4M | |
Location Alias 2: 00/05-06-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 5-6-25-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0321564 | |
License Date: 2004-12-13 | |
License Status: Issued | |
Spud Date: 2005-01-26 | |
Final Drill Date: 2005-01-31 | |
Well Total Depth: 699.00 m | |
Surface Hole Latitude: 51.101258 | |
Surface Hole Longitude: -113.487439 |
Date | Event |
---|---|
2004-12-13 | Obtained License |
2005-01-26 | Surface Casing Operation Performed |
2005-01-31 | Finished Drilling |
2005-01-31 | Well Mode changed to Drilled and Cased |
2005-02-01 | Production Casing Operation Performed |
2005-02-01 | Rig Released |
2005-02-05 | Well Log Performed |
2005-02-22 | Perforation Treatment Performed - Jet Perforation |
2005-03-24 | Perforation Treatment Performed - Fractured |
2005-03-29 | Well Fluid changed to Gas |
2005-03-29 | Well Mode changed to Testing |
2005-05-09 | Perforation Treatment Performed - Jet Perforation |
2005-05-14 | Perforation Treatment Performed - Fractured |
2005-11-05 | Well Began Production |
2005-11-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-11-05 | Well Mode changed to Flowing |
2010-12-06 | Perforation Treatment Performed - Jet Perforation |
2010-12-13 | Perforation Treatment Performed - Fractured |
2011-04-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-18 | Well Mode changed to Flowing |
2011-08-30 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-02-22 | Perforation | 668.00 | 671.00 | 14 |
2005-05-09 | Perforation | 541.30 | 541.80 | 13 |
2005-05-09 | Perforation | 537.60 | 538.10 | 13 |
2005-05-09 | Perforation | 518.60 | 519.10 | 13 |
2005-05-09 | Perforation | 470.00 | 470.50 | 13 |
2005-05-09 | Perforation | 443.30 | 443.80 | 13 |
2005-05-09 | Perforation | 440.50 | 441.00 | 13 |
2005-05-09 | Perforation | 424.60 | 425.10 | 13 |
2005-05-09 | Perforation | 421.90 | 422.40 | 13 |
2005-05-09 | Perforation | 418.10 | 418.60 | 13 |
2005-05-09 | Perforation | 417.10 | 417.60 | 13 |
2005-03-24 | Fracture | 668.00 | 671.00 | 0 |
2005-05-09 | Perforation | 409.80 | 410.30 | 13 |
2005-05-09 | Perforation | 398.40 | 398.90 | 13 |
2005-05-09 | Perforation | 378.80 | 379.30 | 13 |
2005-05-09 | Perforation | 344.90 | 345.40 | 13 |
2005-05-09 | Perforation | 298.30 | 298.80 | 13 |
2005-05-09 | Perforation | 291.20 | 291.70 | 13 |
2005-05-09 | Perforation | 290.10 | 290.60 | 13 |
2005-05-09 | Perforation | 278.40 | 278.90 | 13 |
2005-05-09 | Perforation | 224.30 | 224.80 | 13 |
2005-05-09 | Perforation | 180.00 | 180.50 | 13 |
2005-05-09 | Perforation | 592.90 | 593.40 | 13 |
2005-05-14 | Fracture | 180.00 | 593.40 | 0 |
2010-12-06 | Perforation | 520.00 | 522.00 | 13 |
2010-12-06 | Perforation | 496.50 | 499.50 | 13 |
2010-12-06 | Perforation | 457.50 | 460.50 | 13 |
2010-12-06 | Perforation | 385.00 | 387.00 | 13 |
2010-12-06 | Perforation | 362.50 | 364.50 | 13 |
2010-12-06 | Perforation | 317.50 | 318.50 | 13 |
2010-12-13 | Fracture | 496.50 | 499.50 | 0 |
2010-12-13 | Fracture | 457.50 | 460.50 | 0 |
2011-08-30 | Fracture | 224.30 | 593.40 | 0 |
2005-05-09 | Perforation | 588.80 | 589.30 | 13 |
2005-05-09 | Perforation | 587.90 | 588.40 | 13 |
2005-05-09 | Perforation | 585.00 | 585.50 | 13 |
2005-05-09 | Perforation | 552.30 | 552.80 | 13 |
2005-05-09 | Perforation | 546.90 | 547.40 | 13 |
2005-05-09 | Perforation | 543.50 | 544.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1429 | 0.0 | 0.0 | 0.0 |
2006 | 8656 | 0.0 | 0.0 | 0.0 |
2007 | 8661 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8207 | 0.0 | 0.0 | 0.0 |
2011 | 5862 | 0.0 | 0.0 | 0.0 |
2012 | 8103 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8655 | 0.0 | 0.0 | 0.0 |
2015 | 8662 | 0.0 | 0.0 | 0.0 |
2016 | 8699 | 0.0 | 0.0 | 0.0 |
2017 | 8708 | 0.0 | 0.0 | 0.0 |
2018 | 8750 | 0.0 | 0.0 | 0.0 |
2019 | 8682 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[5]