If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254250311020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.118774,"lon":-113.413704,"icon":""}]} |
Location: 02/11-03-025-25W4/0 | |
Location Alias: 02/11-03-25-25 W4M | |
Location Alias 2: 02/11-03-025-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 25 | |
Section: 03 | |
County/Municipality: Wheatland County | |
Well Name: TORC 102 HZ ENTICE 11-3-25-25 | |
Operator Name: TORC Oil & Gas Ltd. | |
License Number: 0442050 | |
License Date: 2011-12-28 | |
License Status: Suspension | |
Spud Date: 2012-01-08 | |
Final Drill Date: 2012-02-02 | |
Well Total Depth: 3409.00 m | |
Surface Hole Latitude: 51.118774 | |
Surface Hole Longitude: -113.413704 |
Date | Event |
---|---|
2011-12-28 | Obtained License |
2012-01-11 | Surface Casing Operation Performed |
2012-01-16 | Direction Drilling Operation Performed - Horizontal |
2012-01-18 | Well Log Performed |
2012-01-26 | Intermediate Casing Operation Performed |
2012-01-26 | Well Log Performed |
2012-02-02 | Finished Drilling |
2012-02-02 | Well Log Performed |
2012-02-02 | Well Mode changed to Drilled and Cased |
2012-02-06 | Well Log Performed |
2012-02-07 | Production Casing Operation Performed |
2012-02-08 | Rig Released |
2012-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-21 | Well Began Production |
2012-03-21 | Well Fluid changed to Crude Oil |
2012-03-21 | Well Mode changed to Pumping |
2014-11-14 | Well Fluid changed to Crude Oil |
2014-11-14 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-08 | Saxon Drilling Canada Limited Partnership | 152 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-16 | 1744.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-17 | Open Hole/Barefoot Completion | 3399.00 | 3409.00 | 0 |
2012-02-18 | Multi-Stage Fracture | 2852.10 | 2852.20 | 0 |
2012-02-18 | Multi-Stage Fracture | 2790.90 | 2791.00 | 0 |
2012-02-18 | Multi-Stage Fracture | 2729.50 | 2729.60 | 0 |
2012-02-18 | Multi-Stage Fracture | 2668.30 | 2668.40 | 0 |
2012-02-18 | Multi-Stage Fracture | 2607.10 | 2607.20 | 0 |
2012-02-18 | Multi-Stage Fracture | 2545.90 | 2546.00 | 0 |
2012-02-18 | Multi-Stage Fracture | 2484.70 | 2484.80 | 0 |
2012-02-19 | Multi-Stage Fracture | 2423.50 | 2423.60 | 0 |
2012-02-19 | Multi-Stage Fracture | 2362.40 | 2362.50 | 0 |
2012-02-19 | Multi-Stage Fracture | 2234.10 | 2234.20 | 0 |
2012-02-17 | Multi-Stage Fracture | 3381.20 | 3381.30 | 0 |
2012-02-19 | Multi-Stage Fracture | 2172.90 | 2173.00 | 0 |
2012-02-17 | Multi-Stage Fracture | 3320.60 | 3320.70 | 0 |
2012-02-17 | Multi-Stage Fracture | 3246.10 | 3246.20 | 0 |
2012-02-17 | Multi-Stage Fracture | 3157.90 | 3158.00 | 0 |
2012-02-17 | Multi-Stage Fracture | 3096.80 | 3096.90 | 0 |
2012-02-18 | Multi-Stage Fracture | 3035.60 | 3035.70 | 0 |
2012-02-18 | Multi-Stage Fracture | 2974.40 | 2974.50 | 0 |
2012-02-18 | Multi-Stage Fracture | 2913.30 | 2913.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4227 | 0.0 | 0.0 | 0.0 |
2013 | 4532 | 0.0 | 0.0 | 0.0 |
For data sources see[7]