X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254250109000

Well Details

Well ID: 0254250109000
Loading map...
Location: 00/09-01-025-25W4/0
Location Alias: 00/09-01-25-25 W4M
Location Alias 2: 00/09-01-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-1-25-25
Operator Name: Ember Resources Inc.
License Number: 0349150
License Date: 2006-01-17
License Status: Issued
Spud Date: 2006-01-31
Final Drill Date: 2006-02-01
Well Total Depth: 678.00 m
Surface Hole Latitude: 51.106833
Surface Hole Longitude: -113.357907

For data sources see[1][2]

Well History

Date Event
2006-01-17 Obtained License
2006-01-31 Surface Casing Operation Performed
2006-02-01 Finished Drilling
2006-02-01 Well Mode changed to Drilled and Cased
2006-02-02 Production Casing Operation Performed
2006-02-02 Rig Released
2006-02-13 Well Log Performed
2006-03-05 Perforation Treatment Performed - Jet Perforation
2006-03-08 Perforation Treatment Performed - Fractured
2006-10-23 Well Began Production
2006-10-23 Well Fluid changed to Coalbed Methane-Coals Only
2006-10-23 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-05 Perforation 542.00 542.50 13
2006-03-05 Perforation 473.10 474.10 13
2006-03-05 Perforation 418.50 419.00 13
2006-03-05 Perforation 415.10 415.60 13
2006-03-05 Perforation 412.90 413.40 13
2006-03-05 Perforation 406.90 407.40 13
2006-03-05 Perforation 405.50 406.00 13
2006-03-05 Perforation 404.50 405.00 13
2006-03-05 Perforation 402.80 403.30 13
2006-03-05 Perforation 394.50 395.00 13
2006-03-05 Perforation 386.60 387.10 13
2006-03-05 Perforation 536.80 537.30 13
2006-03-05 Perforation 379.50 380.00 13
2006-03-05 Perforation 376.10 376.60 13
2006-03-05 Perforation 375.00 375.50 13
2006-03-05 Perforation 370.00 370.50 13
2006-03-05 Perforation 368.30 368.80 13
2006-03-05 Perforation 366.40 366.90 13
2006-03-05 Perforation 364.80 365.30 13
2006-03-05 Perforation 318.50 319.00 13
2006-03-05 Perforation 251.50 252.00 13
2006-03-05 Perforation 248.00 248.50 13
2006-03-05 Perforation 535.60 536.10 13
2006-03-08 Fracture 248.00 542.50 0
2006-03-05 Perforation 502.40 502.90 13
2006-03-05 Perforation 499.10 499.60 13
2006-03-05 Perforation 497.70 498.20 13
2006-03-05 Perforation 495.40 495.90 13
2006-03-05 Perforation 490.90 491.40 13
2006-03-05 Perforation 480.10 480.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 207 0.0 0.0 0.0
2007 8426 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8724 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8736 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References