X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254250103000

Well Details

Well ID: 0254250103000
Loading map...
Location: 00/03-01-025-25W4/0
Location Alias: 00/03-01-25-25 W4M
Location Alias 2: 00/03-01-025-25 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 25
Section: 01
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 3-1-25-25
Operator Name: Ember Resources Inc.
License Number: 0212537
License Date: 1998-01-23
License Status: Issued
Spud Date: 1998-01-26
Final Drill Date: 1998-02-04
Well Total Depth: 962.00 m
Surface Hole Latitude: 51.096883
Surface Hole Longitude: -113.369236

For data sources see[1][2]

Well History

Date Event
1998-01-23 Obtained License
1998-01-26 Surface Casing Operation Performed
1998-02-04 Finished Drilling
1998-02-04 Production Casing Operation Performed
1998-02-04 Rig Released
1998-02-04 Well Mode changed to Drilled and Cased
1998-02-19 Well Log Performed
1998-02-27 Perforation Treatment Performed - Jet Perforation
1998-03-02 Perforation Treatment Performed - Fractured
1998-03-08 Perforation Treatment Performed - Jet Perforation
1998-03-13 Perforation Treatment Performed - Fractured
1998-11-13 Well Began Production
1998-11-13 Well Fluid changed to Gas
1998-11-13 Well Mode changed to Flowing
2010-01-22 Perforation Treatment Performed - Jet Perforation
2010-02-04 Perforation Treatment Performed - Fractured
2010-02-14 Well Fluid changed to Coalbed Methane-Coals and Other
2010-02-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-27 Perforation 865.00 873.00 7
2010-01-22 Perforation 427.80 428.80 13
2010-01-22 Perforation 393.10 395.10 13
2010-01-22 Perforation 328.00 328.50 13
2010-01-22 Perforation 253.80 254.30 13
2010-01-22 Perforation 200.90 201.40 13
2010-01-22 Perforation 384.00 385.00 13
2010-01-22 Perforation 382.00 382.50 13
2010-01-22 Perforation 364.30 364.80 13
2010-01-22 Perforation 497.20 498.20 13
2010-01-22 Perforation 204.00 205.00 13
1998-03-02 Fracture 865.00 873.00 0
2010-01-22 Perforation 621.00 622.00 13
2010-01-22 Perforation 309.00 310.00 13
2010-01-22 Perforation 476.00 477.00 13
2010-01-22 Perforation 375.00 376.00 13
2010-01-22 Perforation 562.70 564.70 13
2010-01-22 Perforation 522.20 524.20 13
2010-01-22 Perforation 516.80 517.30 13
2010-01-22 Perforation 503.50 504.50 13
2010-01-22 Perforation 525.40 528.40 13
2010-01-22 Perforation 561.50 562.00 13
1998-03-08 Perforation 842.00 845.00 7
2010-02-04 Fracture 200.90 564.70 0
2010-02-04 Fracture 204.00 477.00 0
2010-02-04 Fracture 621.00 622.00 0
1998-03-13 Fracture 842.00 845.00 0
2010-01-22 Perforation 416.80 417.30 13
2010-01-22 Perforation 404.40 404.90 13
2010-01-22 Perforation 397.70 398.70 13
2010-01-22 Perforation 440.30 442.30 13
2010-01-22 Perforation 436.80 439.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 938 0.0 0.0 0.0
1999 8578 0.0 0.0 0.0
2000 8378 0.0 0.0 0.0
2001 8080 0.0 0.0 0.0
2002 8422 0.0 0.0 0.0
2003 8395 0.0 0.0 0.0
2004 8531 0.0 0.0 0.0
2005 8475 0.0 0.0 0.0
2006 7532 0.0 0.0 0.0
2007 7731 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 6814 0.0 0.0 0.0
2011 7462 0.0 0.0 0.0
2012 8644 0.0 0.0 0.0
2013 8442 0.0 0.0 0.0
2014 6946 0.0 0.0 0.0
2015 8592 0.0 0.0 0.0
2016 8635 0.0 0.0 0.0
2017 8574 0.0 0.0 0.0
2018 8294 0.0 0.0 0.0
2019 8682 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[5]

References