X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254242908022

Well Details

Well ID: 0254242908022
Loading map...
Location: 02/08-29-025-24W4/2
Location Alias: 02/08-29-25-24 W4M
Location Alias 2: 02/08-29-025-24 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 29
County/Municipality: Wheatland County
Well Name: EMBER 102 ENTICE 8-29-25-24
Operator Name: Ember Resources Inc.
License Number: 0345722
License Date: 2005-12-15
License Status: Issued
Spud Date: 2006-01-06
Final Drill Date: 2006-01-11
Well Total Depth: 873.00 m
Surface Hole Latitude: 51.161023
Surface Hole Longitude: -113.310940

For data sources see[1][2]

Well History

Date Event
2005-12-15 Obtained License
2006-01-06 Surface Casing Operation Performed
2006-01-11 Finished Drilling
2006-01-11 Production Casing Operation Performed
2006-01-11 Rig Released
2006-01-11 Well Mode changed to Drilled and Cased
2006-01-16 Well Log Performed
2006-01-28 Perforation Treatment Performed - Jet Perforation
2006-02-07 Perforation Treatment Performed - Jet Perforation
2006-02-25 Perforation Treatment Performed - Fractured
2006-03-01 Well Fluid changed to Gas
2006-03-01 Well Mode changed to Testing
2006-08-22 Well Structure changed to Commingled
2009-01-05 Perforation Treatment Performed - Jet Perforation
2009-01-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-28 Perforation 789.00 792.00 13
2009-01-05 Perforation 331.70 332.70 13
2009-01-05 Perforation 315.00 315.50 13
2009-01-05 Perforation 260.40 260.90 13
2009-01-05 Perforation 225.70 226.20 13
2009-01-05 Perforation 258.00 260.00 13
2009-01-05 Perforation 261.60 262.10 13
2009-01-05 Perforation 312.60 313.10 13
2009-01-05 Perforation 310.90 311.40 13
2009-01-05 Perforation 268.80 269.30 13
2009-01-05 Perforation 488.50 489.00 13
2006-02-07 Perforation 667.00 668.00 13
2009-01-05 Perforation 455.70 456.70 13
2009-01-05 Perforation 454.40 455.40 13
2009-01-05 Perforation 490.40 490.90 13
2009-01-05 Perforation 509.10 509.60 13
2009-01-05 Perforation 500.10 500.60 13
2009-01-05 Perforation 492.30 492.80 13
2009-01-05 Perforation 450.50 451.50 13
2009-01-05 Perforation 368.90 369.40 13
2009-01-05 Perforation 366.60 367.60 13
2009-01-05 Perforation 363.20 363.70 13
2006-02-25 Fracture 667.00 668.00 0
2009-01-05 Perforation 413.70 414.20 13
2009-01-05 Perforation 434.70 435.70 13
2009-01-05 Perforation 426.90 427.40 13
2009-01-05 Perforation 420.80 421.80 13
2009-01-08 Fracture 258.00 260.00 0
2009-01-08 Fracture 225.70 509.60 0
2009-01-05 Perforation 326.70 327.20 13
2009-01-05 Perforation 323.30 325.30 13
2009-01-05 Perforation 318.80 319.30 13
2009-01-05 Perforation 329.70 330.70 13
2009-01-05 Perforation 353.40 354.40 13
2009-01-05 Perforation 343.20 343.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 48 0.0 0.0 0.0

For data sources see[5]

References