X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254242702002

Well Details

Well ID: 0254242702002
Loading map...
Location: 00/02-27-025-24W4/2
Location Alias: 00/02-27-25-24 W4M
Location Alias 2: 00/02-27-025-24 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 27
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 2-27-25-24
Operator Name: Ember Resources Inc.
License Number: 0350063
License Date: 2006-01-25
License Status: Issued
Spud Date: 2006-01-31
Final Drill Date: 2006-02-03
Well Total Depth: 636.00 m
Surface Hole Latitude: 51.156211
Surface Hole Longitude: -113.269084

For data sources see[1][2]

Well History

Date Event
2006-01-25 Obtained License
2006-01-31 Surface Casing Operation Performed
2006-02-03 Finished Drilling
2006-02-03 Well Mode changed to Drilled and Cased
2006-02-04 Production Casing Operation Performed
2006-02-04 Rig Released
2006-02-13 Well Log Performed
2006-02-27 Perforation Treatment Performed - Jet Perforation
2006-03-10 Perforation Treatment Performed - Fractured
2006-05-04 Perforation Treatment Performed - Jet Perforation
2006-05-15 Perforation Treatment Performed - Fractured
2006-06-26 Well Began Production
2006-06-26 Well Fluid changed to Coalbed Methane-Coals and Other
2006-06-26 Well Mode changed to Flowing
2011-06-24 Perforation Treatment Performed - Jet Perforation
2011-06-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-27 Perforation 456.50 459.50 13
2006-05-04 Perforation 447.90 448.40 13
2006-05-04 Perforation 441.70 442.20 13
2006-05-04 Perforation 435.50 436.50 13
2006-05-04 Perforation 382.70 383.20 13
2006-05-04 Perforation 381.10 381.60 13
2006-05-04 Perforation 367.30 367.80 13
2006-05-04 Perforation 357.00 357.50 13
2006-05-04 Perforation 343.80 344.30 13
2006-05-04 Perforation 341.10 342.10 13
2006-05-04 Perforation 337.10 337.60 13
2006-03-10 Fracture 456.50 459.50 0
2006-05-04 Perforation 334.50 335.50 13
2006-05-04 Perforation 328.40 328.90 13
2006-05-04 Perforation 319.30 319.80 13
2006-05-04 Perforation 306.50 307.00 13
2006-05-04 Perforation 279.80 280.30 13
2006-05-04 Perforation 272.30 272.80 13
2006-05-04 Perforation 243.00 243.50 13
2006-05-04 Perforation 230.00 230.50 13
2006-05-04 Perforation 215.80 216.30 13
2006-05-04 Perforation 213.30 213.80 13
2006-05-04 Perforation 508.50 509.00 13
2006-05-04 Perforation 202.30 202.80 13
2006-05-15 Fracture 202.30 509.00 0
2011-06-24 Perforation 418.00 420.00 13
2011-06-24 Perforation 207.00 208.00 13
2011-06-24 Perforation 246.00 249.00 13
2011-06-24 Perforation 287.00 288.00 13
2011-06-24 Perforation 292.00 295.00 13
2011-06-24 Perforation 298.00 300.00 13
2011-06-24 Perforation 302.00 304.00 13
2011-06-24 Perforation 351.00 354.00 13
2006-05-04 Perforation 506.00 506.50 13
2011-06-27 Fracture 207.00 509.00 0
2006-05-04 Perforation 502.90 503.40 13
2006-05-04 Perforation 467.70 468.20 13
2006-05-04 Perforation 466.50 467.00 13
2006-05-04 Perforation 461.40 461.90 13
2006-05-04 Perforation 460.40 460.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4309 0.0 0.0 0.0
2007 7531 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8718 0.0 0.0 0.0
2012 8745 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8730 0.0 0.0 0.0
2016 8710 0.0 0.0 0.0
2017 8541 0.0 0.0 0.0
2018 8704 0.0 0.0 0.0
2019 8745 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References