X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254242309000

Well Details

Well ID: 0254242309000
Loading map...
Location: 00/09-23-025-24W4/0
Location Alias: 00/09-23-25-24 W4M
Location Alias 2: 00/09-23-025-24 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 23
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 9-23-25-24
Operator Name: Ember Resources Inc.
License Number: 0348352
License Date: 2006-01-10
License Status: Issued
Spud Date: 2006-01-16
Final Drill Date: 2006-01-20
Well Total Depth: 859.00 m
Surface Hole Latitude: 51.148675
Surface Hole Longitude: -113.242038

For data sources see[1][2]

Well History

Date Event
2006-01-10 Obtained License
2006-01-16 Surface Casing Operation Performed
2006-01-20 Finished Drilling
2006-01-20 Production Casing Operation Performed
2006-01-20 Rig Released
2006-01-20 Well Mode changed to Drilled and Cased
2006-01-24 Well Log Performed
2006-02-16 Perforation Treatment Performed - Jet Perforation
2006-02-24 Perforation Treatment Performed - Jet Perforation
2006-03-21 Perforation Treatment Performed - Jet Perforation
2006-05-16 Perforation Treatment Performed - Fractured
2006-05-25 Well Began Production
2006-05-25 Well Fluid changed to Coalbed Methane-Coals and Other
2006-05-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-16 Perforation 825.00 826.00 13
2006-03-21 Perforation 438.40 438.90 13
2006-03-21 Perforation 432.70 433.20 13
2006-03-21 Perforation 427.60 428.60 13
2006-03-21 Perforation 418.50 419.00 13
2006-03-21 Perforation 372.20 372.70 13
2006-03-21 Perforation 371.00 371.50 13
2006-03-21 Perforation 369.50 370.00 13
2006-03-21 Perforation 367.50 368.00 13
2006-03-21 Perforation 356.40 356.90 13
2006-03-21 Perforation 355.50 356.00 13
2006-02-24 Perforation 409.00 413.00 13
2006-03-21 Perforation 346.50 347.00 13
2006-03-21 Perforation 332.50 333.00 13
2006-03-21 Perforation 327.90 328.40 13
2006-03-21 Perforation 325.00 325.50 13
2006-03-21 Perforation 323.30 323.80 13
2006-03-21 Perforation 322.30 322.80 13
2006-03-21 Perforation 321.20 321.70 13
2006-03-21 Perforation 319.50 320.00 13
2006-03-21 Perforation 315.80 316.30 13
2006-03-21 Perforation 313.00 313.50 13
2006-03-21 Perforation 509.70 510.20 13
2006-03-21 Perforation 300.20 300.70 13
2006-03-21 Perforation 261.60 262.10 13
2006-03-21 Perforation 260.50 261.00 13
2006-03-21 Perforation 220.60 221.10 13
2006-03-21 Perforation 203.90 204.40 13
2006-05-16 Fracture 203.90 510.20 0
2006-03-21 Perforation 496.80 497.30 13
2006-03-21 Perforation 491.40 491.90 13
2006-03-21 Perforation 455.40 455.90 13
2006-03-21 Perforation 453.60 454.10 13
2006-03-21 Perforation 447.10 447.60 13
2006-03-21 Perforation 445.90 446.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5178 0.0 0.0 0.0
2007 7232 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8739 0.0 0.0 0.0
2012 8773 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8725 0.0 0.0 0.0
2016 8728 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 8679 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References