X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254241416005

Well Details

Well ID: 0254241416005
Loading map...
Location: 00/16-14-025-24W4/5
Location Alias: 00/16-14-25-24 W4M
Location Alias 2: 00/16-14-025-24 W4/05
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 14
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 16-14-25-24
Operator Name: Ember Resources Inc.
License Number: 0204301
License Date: 1997-08-01
License Status: Issued
Spud Date: 1997-09-20
Final Drill Date: 1997-09-21
Well Total Depth: 939.00 m
Surface Hole Latitude: 51.138230
Surface Hole Longitude: -113.238566

For data sources see[1][2]

Well History

Date Event
1997-08-01 Obtained License
1997-09-21 Finished Drilling
1997-09-21 Production Casing Operation Performed
1997-09-21 Rig Released
1997-09-21 Well Mode changed to Drilled and Cased
1997-10-18 Well Log Performed
2001-06-16 Perforation Treatment Performed - Jet Perforation
2001-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-16 Perforation Treatment Performed - Jet Perforation
2001-08-16 Plug Back Performed
2001-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-06 Perforation Treatment Performed - Jet Perforation
2001-09-06 Plug Back Performed
2001-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-24 Perforation Treatment Performed - Jet Perforation
2001-09-24 Plug Back Performed
2001-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-01 Perforation Treatment Performed - Jet Perforation
2001-10-01 Plug Back Performed
2001-10-11 Perforation Treatment Performed - Jet Perforation
2002-11-14 Well Began Production
2002-11-14 Well Fluid changed to Gas
2002-11-14 Well Mode changed to Flowing
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-02-08 Perforation Treatment Performed - Fractured
2009-02-27 Well Fluid changed to Coalbed Methane-Coals and Other
2009-02-27 Well Mode changed to Flowing
2011-06-13 Perforation Treatment Performed - Jet Perforation
2011-06-27 Perforation Treatment Performed - Fractured
2011-07-09 Well Fluid changed to Coalbed Methane-Coals and Other
2011-07-09 Well Mode changed to Suspended
2011-07-10 Well Fluid changed to Coalbed Methane-Coals and Other
2011-07-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-06-16 Perforation 817.50 820.50 13
2001-10-01 Perforation 693.00 696.00 7
2001-10-11 Perforation 583.50 586.50 7
2009-02-05 Perforation 347.60 348.10 13
2009-02-05 Perforation 345.90 346.90 13
2009-02-05 Perforation 291.30 291.80 13
2009-02-05 Perforation 356.90 357.40 13
2009-02-05 Perforation 352.60 355.60 13
2009-02-05 Perforation 348.60 349.60 13
2009-02-05 Perforation 216.60 217.10 13
2009-02-05 Perforation 207.80 208.80 13
2001-08-16 Packing Device Capped w/Cement 811.00 814.00 0
2009-02-05 Perforation 334.00 337.00 13
2009-02-05 Perforation 248.90 250.90 13
2009-02-05 Perforation 242.80 243.30 13
2009-02-05 Perforation 226.50 227.00 13
2009-02-05 Perforation 360.40 361.40 13
2009-02-05 Perforation 471.50 472.00 13
2009-02-05 Perforation 469.30 470.30 13
2009-02-05 Perforation 464.80 465.80 13
2009-02-05 Perforation 523.30 523.80 13
2009-02-05 Perforation 516.20 516.70 13
2001-08-16 Perforation 805.00 808.00 7
2009-02-05 Perforation 477.00 478.00 13
2009-02-05 Perforation 394.50 395.00 13
2009-02-05 Perforation 382.90 384.90 13
2009-02-05 Perforation 373.50 374.00 13
2009-02-05 Perforation 458.90 459.40 13
2009-02-05 Perforation 452.30 453.30 13
2009-02-05 Perforation 396.50 398.50 13
2009-02-08 Fracture 334.00 337.00 0
2009-02-08 Fracture 207.80 523.80 0
2011-06-13 Perforation 232.00 234.00 13
2001-09-06 Packing Device Capped w/Cement 793.00 801.00 0
2011-06-13 Perforation 266.50 269.50 13
2011-06-13 Perforation 305.00 306.00 13
2011-06-13 Perforation 308.00 309.00 13
2011-06-13 Perforation 314.00 315.00 13
2011-06-13 Perforation 321.50 323.50 13
2011-06-13 Perforation 401.00 402.00 13
2011-06-13 Perforation 432.00 435.00 13
2011-06-27 Fracture 207.80 523.80 0
2001-09-06 Perforation 765.00 768.00 7
2001-09-24 Packing Device Capped w/Cement 752.00 760.00 0
2001-09-24 Perforation 724.00 728.00 7
2001-10-01 Packing Device Capped w/Cement 719.00 722.00 0
2001-10-01 Perforation 702.50 707.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1147 0.0 0.0 0.0
2003 8434 0.0 0.0 0.0
2004 8463 0.0 0.0 0.0
2005 8688 0.0 0.0 0.0
2006 8616 0.0 0.0 0.0
2007 7717 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8399 0.0 0.0 0.0
2011 8724 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8736 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References