If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254240916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.121911,"lon":-113.286165,"icon":""}]} |
Location: 00/16-09-025-24W4/0 | |
Location Alias: 00/16-09-25-24 W4M | |
Location Alias 2: 00/16-09-025-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 24 | |
Section: 09 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 16-9-25-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0426681 | |
License Date: 2010-12-01 | |
License Status: Issued | |
Spud Date: 2011-01-05 | |
Final Drill Date: 2011-01-06 | |
Well Total Depth: 909.00 m | |
Surface Hole Latitude: 51.121911 | |
Surface Hole Longitude: -113.286165 |
Date | Event |
---|---|
2010-12-01 | Obtained License |
2011-01-05 | Direction Drilling Operation Performed - Deviate |
2011-01-06 | Finished Drilling |
2011-01-06 | Production Casing Operation Performed |
2011-01-06 | Rig Released |
2011-01-06 | Surface Casing Operation Performed |
2011-01-06 | Well Mode changed to Drilled and Cased |
2011-01-15 | Well Log Performed |
2011-02-04 | Perforation Treatment Performed - Jet Perforation |
2011-02-17 | Perforation Treatment Performed - Fractured |
2011-02-20 | Well Fluid changed to Gas |
2011-02-20 | Well Mode changed to Testing |
2011-03-01 | Perforation Treatment Performed - Jet Perforation |
2011-03-09 | Perforation Treatment Performed - Fractured |
2011-04-18 | Well Began Production |
2011-04-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-18 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-05 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-04 | Perforation | 764.50 | 766.50 | 13 |
2011-03-01 | Perforation | 352.90 | 353.40 | 13 |
2011-03-01 | Perforation | 372.50 | 374.00 | 13 |
2011-03-01 | Perforation | 386.90 | 387.40 | 13 |
2011-03-01 | Perforation | 392.40 | 392.90 | 13 |
2011-03-01 | Perforation | 378.10 | 380.60 | 13 |
2011-03-01 | Perforation | 384.30 | 384.80 | 13 |
2011-03-01 | Perforation | 282.20 | 282.70 | 13 |
2011-03-01 | Perforation | 341.00 | 344.00 | 13 |
2011-03-01 | Perforation | 477.90 | 478.40 | 13 |
2011-03-01 | Perforation | 240.00 | 243.00 | 13 |
2011-02-04 | Perforation | 361.00 | 364.00 | 13 |
2011-03-01 | Perforation | 335.00 | 336.00 | 13 |
2011-03-01 | Perforation | 554.60 | 555.60 | 13 |
2011-03-01 | Perforation | 250.40 | 250.90 | 13 |
2011-03-01 | Perforation | 278.40 | 278.90 | 13 |
2011-03-01 | Perforation | 180.20 | 180.70 | 13 |
2011-03-01 | Perforation | 235.40 | 236.40 | 13 |
2011-03-01 | Perforation | 403.30 | 403.80 | 13 |
2011-03-01 | Perforation | 551.00 | 553.00 | 13 |
2011-03-01 | Perforation | 556.60 | 557.10 | 13 |
2011-03-01 | Perforation | 514.00 | 515.50 | 13 |
2011-02-04 | Perforation | 882.00 | 883.00 | 13 |
2011-03-01 | Perforation | 518.70 | 519.70 | 13 |
2011-03-01 | Perforation | 869.40 | 870.40 | 13 |
2011-03-01 | Perforation | 559.40 | 560.40 | 13 |
2011-03-01 | Perforation | 566.20 | 566.70 | 13 |
2011-03-01 | Perforation | 696.90 | 697.90 | 13 |
2011-03-01 | Perforation | 576.30 | 576.80 | 13 |
2011-03-01 | Perforation | 510.80 | 511.80 | 13 |
2011-03-01 | Perforation | 487.90 | 488.40 | 13 |
2011-03-01 | Perforation | 416.50 | 418.50 | 13 |
2011-03-01 | Perforation | 473.00 | 475.00 | 13 |
2011-02-17 | Fracture | 361.00 | 364.00 | 0 |
2011-03-01 | Perforation | 428.10 | 428.60 | 13 |
2011-03-01 | Perforation | 430.30 | 433.10 | 13 |
2011-03-01 | Perforation | 505.20 | 506.20 | 13 |
2011-03-01 | Perforation | 494.60 | 495.60 | 13 |
2011-03-01 | Perforation | 509.20 | 510.20 | 13 |
2011-03-01 | Perforation | 488.70 | 489.20 | 13 |
2011-03-09 | Fracture | 477.90 | 478.40 | 0 |
2011-03-09 | Fracture | 240.00 | 243.00 | 0 |
2011-03-09 | Fracture | 554.60 | 555.60 | 0 |
2011-03-09 | Fracture | 335.00 | 344.00 | 0 |
2011-02-17 | Fracture | 764.50 | 766.50 | 0 |
2011-03-09 | Fracture | 487.90 | 511.80 | 0 |
2011-03-09 | Fracture | 518.70 | 553.00 | 0 |
2011-03-09 | Fracture | 556.60 | 870.40 | 0 |
2011-03-09 | Fracture | 370.90 | 475.00 | 0 |
2011-03-09 | Fracture | 235.40 | 236.40 | 0 |
2011-03-09 | Fracture | 250.40 | 310.80 | 0 |
2011-03-09 | Fracture | 352.90 | 353.40 | 0 |
2011-02-17 | Fracture | 882.00 | 883.00 | 0 |
2011-03-01 | Perforation | 367.70 | 368.70 | 13 |
2011-03-01 | Perforation | 370.90 | 371.40 | 13 |
2011-03-01 | Perforation | 310.30 | 310.80 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6161 | 0.0 | 0.0 | 0.0 |
2012 | 8686 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8736 | 0.0 | 0.0 | 0.0 |
2018 | 8736 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]