X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254240801000

Well Details

Well ID: 0254240801000
Loading map...
Location: 00/01-08-025-24W4/0
Location Alias: 00/01-08-25-24 W4M
Location Alias 2: 00/01-08-025-24 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 24
Section: 08
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 1-8-25-24
Operator Name: Ember Resources Inc.
License Number: 0404586
License Date: 2008-11-25
License Status: Issued
Spud Date: 2009-01-06
Final Drill Date: 2009-01-06
Well Total Depth: 1022.00 m
Surface Hole Latitude: 51.118283
Surface Hole Longitude: -113.321521

For data sources see[1][2]

Well History

Date Event
2008-11-25 Obtained License
2009-01-06 Direction Drilling Operation Performed - Deviate
2009-01-06 Finished Drilling
2009-01-06 Surface Casing Operation Performed
2009-01-06 Well Mode changed to Drilled and Cased
2009-01-07 Production Casing Operation Performed
2009-01-07 Rig Released
2009-01-14 Well Log Performed
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-02-13 Perforation Treatment Performed - Fractured
2009-02-27 Well Began Production
2009-02-27 Well Fluid changed to Coalbed Methane-Coals and Other
2009-02-27 Well Mode changed to Flowing
2009-06-27 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-06 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-05 Perforation 544.20 545.20 20
2009-02-05 Perforation 649.00 652.00 20
2009-02-05 Perforation 511.60 512.60 20
2009-02-05 Perforation 496.60 497.10 20
2009-02-05 Perforation 437.10 437.60 20
2009-02-05 Perforation 574.20 574.70 20
2009-02-05 Perforation 725.70 726.20 20
2009-02-05 Perforation 716.60 717.10 20
2009-02-05 Perforation 708.60 710.60 20
2009-02-05 Perforation 782.20 782.70 20
2009-02-05 Perforation 777.30 778.30 20
2009-02-05 Perforation 540.30 540.80 20
2009-02-05 Perforation 774.40 774.90 20
2009-02-05 Perforation 695.90 696.90 20
2009-02-05 Perforation 594.80 597.80 20
2009-02-05 Perforation 593.30 594.30 20
2009-02-05 Perforation 578.20 580.20 20
2009-02-05 Perforation 683.00 683.50 20
2009-02-05 Perforation 672.30 674.30 20
2009-02-05 Perforation 660.10 660.60 20
2009-02-13 Fracture 649.00 652.00 0
2009-02-13 Fracture 326.50 782.70 0
2009-02-05 Perforation 534.10 537.10 20
2009-02-05 Perforation 563.00 564.00 20
2009-02-05 Perforation 551.70 552.70 20
2009-02-05 Perforation 546.90 547.40 20
2009-02-05 Perforation 516.00 516.50 20
2009-02-05 Perforation 342.80 343.30 20
2009-02-05 Perforation 326.50 327.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7391 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8724 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8736 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References