If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254240511020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.104042,"lon":-113.329646,"icon":""}]} |
Location: 02/11-05-025-24W4/0 | |
Location Alias: 02/11-05-25-24 W4M | |
Location Alias 2: 02/11-05-025-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Wheatland County | |
Well Name: EMBER 102 ENTICE 11-5-25-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0427890 | |
License Date: 2010-12-16 | |
License Status: Issued | |
Spud Date: 2011-12-05 | |
Final Drill Date: 2011-12-06 | |
Well Total Depth: 1095.00 m | |
Surface Hole Latitude: 51.104042 | |
Surface Hole Longitude: -113.329646 |
Date | Event |
---|---|
2010-12-16 | Obtained License |
2011-12-05 | Direction Drilling Operation Performed - Deviate |
2011-12-05 | Surface Casing Operation Performed |
2011-12-06 | Finished Drilling |
2011-12-06 | Production Casing Operation Performed |
2011-12-06 | Well Mode changed to Drilled and Cased |
2011-12-07 | Rig Released |
2011-12-13 | Well Log Performed |
2012-01-23 | Perforation Treatment Performed - Jet Perforation |
2012-01-28 | Perforation Treatment Performed - Fractured |
2012-02-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-01 | Well Mode changed to Testing |
2012-02-08 | Perforation Treatment Performed - Jet Perforation |
2012-02-19 | Perforation Treatment Performed - Fractured |
2012-02-28 | Well Began Production |
2012-02-28 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-05 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-23 | Perforation | 747.00 | 750.00 | 13 |
2012-02-08 | Perforation | 287.00 | 288.00 | 13 |
2012-02-08 | Perforation | 335.00 | 336.00 | 13 |
2012-02-08 | Perforation | 341.10 | 341.60 | 13 |
2012-02-08 | Perforation | 351.00 | 354.00 | 13 |
2012-02-08 | Perforation | 385.90 | 386.90 | 13 |
2012-02-08 | Perforation | 390.60 | 391.60 | 13 |
2012-02-08 | Perforation | 433.00 | 434.00 | 13 |
2012-02-08 | Perforation | 442.00 | 442.50 | 13 |
2012-02-08 | Perforation | 451.50 | 453.50 | 13 |
2012-02-08 | Perforation | 456.60 | 458.10 | 13 |
2012-01-23 | Perforation | 890.00 | 891.00 | 13 |
2012-02-08 | Perforation | 460.20 | 460.70 | 13 |
2012-02-08 | Perforation | 465.30 | 465.80 | 13 |
2012-02-08 | Perforation | 467.80 | 468.30 | 13 |
2012-02-08 | Perforation | 477.40 | 479.40 | 13 |
2012-02-08 | Perforation | 482.10 | 484.10 | 13 |
2012-02-08 | Perforation | 489.70 | 490.70 | 13 |
2012-02-08 | Perforation | 504.20 | 505.20 | 13 |
2012-02-08 | Perforation | 512.80 | 514.30 | 13 |
2012-02-08 | Perforation | 515.30 | 517.80 | 13 |
2012-02-08 | Perforation | 528.30 | 528.80 | 13 |
2012-01-23 | Perforation | 980.00 | 982.00 | 13 |
2012-02-08 | Perforation | 530.20 | 533.20 | 13 |
2012-02-08 | Perforation | 536.00 | 539.00 | 13 |
2012-02-08 | Perforation | 578.50 | 580.50 | 13 |
2012-02-08 | Perforation | 583.80 | 584.80 | 13 |
2012-02-08 | Perforation | 595.80 | 597.30 | 13 |
2012-02-08 | Perforation | 603.20 | 604.20 | 13 |
2012-02-08 | Perforation | 615.30 | 616.30 | 13 |
2012-02-08 | Perforation | 621.70 | 622.20 | 13 |
2012-02-08 | Perforation | 623.60 | 624.60 | 13 |
2012-02-08 | Perforation | 626.40 | 626.90 | 13 |
2012-01-23 | Perforation | 1015.00 | 1017.00 | 13 |
2012-02-08 | Perforation | 629.20 | 630.70 | 13 |
2012-02-08 | Perforation | 634.60 | 635.10 | 13 |
2012-02-08 | Perforation | 673.00 | 675.00 | 13 |
2012-02-08 | Perforation | 678.00 | 679.00 | 13 |
2012-02-08 | Perforation | 679.90 | 680.90 | 13 |
2012-02-08 | Perforation | 684.00 | 684.50 | 13 |
2012-02-08 | Perforation | 686.80 | 687.80 | 13 |
2012-02-19 | Fracture | 280.10 | 687.80 | 0 |
2012-01-28 | Fracture | 747.00 | 750.00 | 0 |
2012-01-28 | Fracture | 890.00 | 891.00 | 0 |
2012-01-28 | Fracture | 980.00 | 982.00 | 0 |
2012-01-28 | Fracture | 1015.00 | 1017.00 | 0 |
2012-02-08 | Perforation | 280.10 | 280.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7326 | 0.0 | 0.0 | 0.0 |
2013 | 8720 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8685 | 0.0 | 0.0 | 0.0 |
2016 | 8691 | 0.0 | 0.0 | 0.0 |
2017 | 8736 | 0.0 | 0.0 | 0.0 |
2018 | 8742 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]