If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254232514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.167679,"lon":-113.089087,"icon":""}]} |
Location: 00/14-25-025-23W4/0 | |
Location Alias: 00/14-25-25-23 W4M | |
Location Alias 2: 00/14-25-025-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 23 | |
Section: 25 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG ROFORD 14-25-25-23 | |
Operator Name: Lynx Energy ULC | |
License Number: 0313191 | |
License Date: 2004-08-11 | |
License Status: Issued | |
Spud Date: 2004-08-16 | |
Final Drill Date: 2004-08-30 | |
Well Total Depth: 860.00 m | |
Surface Hole Latitude: 51.167679 | |
Surface Hole Longitude: -113.089087 |
Date | Event |
---|---|
2004-08-11 | Obtained License |
2004-08-16 | Surface Casing Operation Performed |
2004-08-30 | Finished Drilling |
2004-08-30 | Well Mode changed to Drilled and Cased |
2004-08-31 | Production Casing Operation Performed |
2004-08-31 | Rig Released |
2004-09-06 | Well Log Performed |
2004-10-30 | Perforation Treatment Performed - Jet Perforation |
2005-01-21 | Perforation Treatment Performed - Fractured |
2005-01-25 | Well Fluid changed to Gas |
2005-01-25 | Well Mode changed to Testing |
2005-02-03 | Perforation Treatment Performed - Jet Perforation |
2005-02-14 | Perforation Treatment Performed - Fractured |
2005-02-24 | Perforation Treatment Performed - Jet Perforation |
2005-03-21 | Perforation Treatment Performed - Fractured |
2005-04-24 | Perforation Treatment Performed - Jet Perforation |
2005-05-06 | Perforation Treatment Performed - Jet Perforation |
2005-05-11 | Perforation Treatment Performed - Jet Perforation |
2006-02-11 | Perforation Treatment Performed - Jet Perforation |
2006-02-15 | Perforation Treatment Performed - Fractured |
2006-03-03 | Well Began Production |
2006-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-03-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-10-30 | Perforation | 780.00 | 782.50 | 13 |
2006-02-11 | Perforation | 773.30 | 774.30 | 13 |
2006-02-11 | Perforation | 478.60 | 479.60 | 13 |
2006-02-11 | Perforation | 476.40 | 477.40 | 13 |
2006-02-11 | Perforation | 442.60 | 444.60 | 13 |
2006-02-11 | Perforation | 425.60 | 426.60 | 13 |
2006-02-11 | Perforation | 419.00 | 420.00 | 13 |
2006-02-11 | Perforation | 411.20 | 412.20 | 13 |
2006-02-11 | Perforation | 354.40 | 356.40 | 13 |
2006-02-11 | Perforation | 347.90 | 348.90 | 13 |
2006-02-11 | Perforation | 340.00 | 341.00 | 13 |
2005-01-21 | Fracture | 780.00 | 782.50 | 0 |
2006-02-11 | Perforation | 337.20 | 338.20 | 13 |
2006-02-11 | Perforation | 312.10 | 313.10 | 13 |
2006-02-11 | Perforation | 310.80 | 311.80 | 13 |
2006-02-11 | Perforation | 306.30 | 307.30 | 13 |
2006-02-11 | Perforation | 301.40 | 303.40 | 13 |
2006-02-11 | Perforation | 298.00 | 299.00 | 13 |
2006-02-11 | Perforation | 294.60 | 295.60 | 13 |
2006-02-11 | Perforation | 248.70 | 249.70 | 13 |
2006-02-11 | Perforation | 244.90 | 245.90 | 13 |
2006-02-15 | Fracture | 244.90 | 774.30 | 0 |
2005-02-03 | Perforation | 770.50 | 773.50 | 13 |
2005-02-14 | Fracture | 770.50 | 773.50 | 0 |
2005-02-24 | Perforation | 728.00 | 731.50 | 14 |
2005-03-21 | Fracture | 728.00 | 731.50 | 0 |
2005-04-24 | Perforation | 689.50 | 700.00 | 13 |
2005-05-06 | Perforation | 351.50 | 353.00 | 13 |
2005-05-11 | Perforation | 329.00 | 333.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 3625 | 0.0 | 0.0 | 0.0 |
2007 | 8602 | 0.0 | 0.0 | 0.0 |
2008 | 8708 | 0.0 | 0.0 | 0.0 |
2009 | 8614 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8752 | 0.0 | 0.0 | 0.0 |
2012 | 8752 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8662 | 0.0 | 0.0 | 0.0 |
2015 | 8691 | 0.0 | 0.0 | 0.0 |
2016 | 8748 | 0.0 | 0.0 | 0.0 |
2017 | 8562 | 0.0 | 0.0 | 0.0 |
2018 | 8505 | 0.0 | 0.0 | 0.0 |
2019 | 8612 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]