X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254232214020

Well Details

Well ID: 0254232214020
Loading map...
Location: 02/14-22-025-23W4/0
Location Alias: 02/14-22-25-23 W4M
Location Alias 2: 02/14-22-025-23 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 22
County/Municipality: Wheatland County
Well Name: PCP 14A ROCKYFORD 14-22-25-23
Operator Name: Lynx Energy ULC
License Number: 0177792
License Date: 1995-05-09
License Status: Issued
Spud Date: 1995-07-25
Final Drill Date: 1995-08-02
Well Total Depth: 1652.00 m
Surface Hole Latitude: 51.149792
Surface Hole Longitude: -113.136434

For data sources see[1][2]

Well History

Date Event
1995-05-09 Obtained License
1995-07-25 Surface Casing Operation Performed
1995-07-28 Direction Drilling Operation Performed - Deviate
1995-08-02 Finished Drilling
1995-08-02 Well Log Performed
1995-08-02 Well Mode changed to Drilled and Cased
1995-08-04 Production Casing Operation Performed
1995-08-04 Rig Released
1995-08-09 Well Log Performed
1995-09-19 Well Log Performed
1995-09-20 Perforation Treatment Performed - Jet Perforation
1995-09-24 Well Began Production
1995-09-24 Well Fluid changed to Crude Oil
1995-09-24 Well Mode changed to Pumping
1995-09-25 Well Fluid changed to Crude Oil
1995-09-25 Well Mode changed to Suspended
1995-10-14 Well Fluid changed to Crude Oil
1995-10-14 Well Mode changed to Pumping
1997-02-14 Perforation Treatment Performed - Jet Perforation
1997-02-14 Well Log Performed
1998-02-13 Well Log Performed
1998-08-01 Well Fluid changed to Crude Oil
1998-08-01 Well Mode changed to Suspended
2000-05-17 Well Fluid changed to Crude Oil
2000-05-17 Well Mode changed to Pumping
2001-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-29 Perforation Treatment Performed - Jet Perforation
2001-09-30 Well Log Performed
2002-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-01 Perforation Treatment Performed - Jet Perforation
2002-05-01 Plug Back Performed
2002-05-01 Well Fluid changed to Crude Oil
2002-05-01 Well Mode changed to Abandoned Zone
2002-05-02 Well Log Performed
2006-07-13 Perforation Treatment Performed - Jet Perforation
2006-07-13 Well Log Performed
2006-07-21 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-28 799.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-20 Perforation 1612.00 1615.00 20
2006-07-21 Fracture 649.50 655.00 0
1997-02-14 Perforation 1606.00 1608.00 20
2001-09-28 Packing Device Capped w/Cement 1608.00 1611.00 0
2001-09-28 Packing Device Capped w/Cement 1602.00 1605.00 0
2001-09-29 Perforation 1591.50 1593.50 20
2002-05-01 Packing Device Capped w/Cement 1577.00 1585.00 0
2002-05-01 Perforation 709.00 710.50 17
2006-07-13 Perforation 653.00 655.00 20
2006-07-13 Perforation 649.50 651.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1893 0.0 0.0 0.0
1996 8348 0.0 0.0 0.0
1997 5253 0.0 0.0 0.0
1998 583 0.0 0.0 0.0
2000 5350 0.0 0.0 0.0
2001 3005 0.0 0.0 0.0
2002 144 0.0 0.0 0.0

For data sources see[6]

References