X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254232206000

Well Details

Well ID: 0254232206000
Loading map...
Location: 00/06-22-025-23W4/0
Location Alias: 00/06-22-25-23 W4M
Location Alias 2: 00/06-22-025-23 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 22
County/Municipality: Wheatland County
Well Name: HARVEST ROFORD 6-22-25-23
Operator Name: Harvest Operations Corp.
License Number: 0131321
License Date: 1988-01-13
License Status: Suspension
Spud Date: 1988-02-03
Final Drill Date: 1988-02-09
Well Total Depth: 1605.00 m
Surface Hole Latitude: 51.146203
Surface Hole Longitude: -113.137440

For data sources see[1][2]

Well History

Date Event
1988-01-13 Obtained License
1988-02-04 Surface Casing Operation Performed
1988-02-09 Finished Drilling
1988-02-09 Well Log Performed
1988-02-09 Well Mode changed to Drilled and Cased
1988-02-10 Drill Stem Test Performed
1988-02-11 Production Casing Operation Performed
1988-02-12 Rig Released
1988-03-15 Well Log Performed
1988-03-16 Perforation Treatment Performed - Jet Perforation
1988-05-01 Well Began Production
1988-05-01 Well Fluid changed to Crude Oil
1988-05-01 Well Mode changed to Flowing
1993-12-01 Well Fluid changed to Crude Oil
1993-12-01 Well Mode changed to Pumping
1999-07-08 Perforation Treatment Performed - Jet Perforation
1999-07-09 Well Log Performed
2007-08-01 Well Fluid changed to Crude Oil
2007-08-01 Well Mode changed to Suspended
2016-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-12 Plug Back Performed
2016-02-12 Well Fluid changed to Crude Oil
2016-02-12 Well Log Performed
2016-02-12 Well Mode changed to Abandoned Zone
2016-02-13 Well Log Performed
2016-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-22 Perforation Treatment Performed - Cement Squeeze
2016-02-22 Perforation Treatment Performed - Jet Perforation
2016-02-22 Plug Back Performed
2016-02-22 Well Log Performed
2016-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-23 Perforation Treatment Performed - Cement Squeeze
2016-02-23 Perforation Treatment Performed - Jet Perforation
2016-02-23 Plug Back Performed
2016-02-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-16 Perforation 1563.00 1566.50 13
2016-02-23 Cement Squeeze 468.00 469.00 0
2016-02-23 Packing Device Capped w/Cement 428.00 467.00 0
1999-07-08 Perforation 1563.00 1566.50 20
2016-02-12 Packing Device Capped w/Cement 1548.00 1558.00 0
2016-02-22 Perforation 587.00 588.00 17
2016-02-22 Cement Squeeze 587.00 588.00 0
2016-02-22 Packing Device Capped w/Cement 539.50 583.00 0
2016-02-23 Perforation 510.00 511.00 17
2016-02-23 Packing Device Capped w/Cement 497.00 505.00 0
2016-02-23 Perforation 468.00 469.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4270 0.0 0.0 0.0
1989 4569 0.0 0.0 0.0
1990 3670 0.0 0.0 0.0
1991 4141 0.0 0.0 0.0
1992 7894 0.0 0.0 0.0
1993 7923 0.0 0.0 0.0
1994 8474 0.0 0.0 0.0
1995 8656 0.0 0.0 0.0
1996 8571 0.0 0.0 0.0
1997 8678 0.0 0.0 0.0
1998 8280 0.0 0.0 0.0
1999 8322 0.0 0.0 0.0
2000 8094 0.0 0.0 0.0
2001 7751 0.0 0.0 0.0
2002 7762 0.0 0.0 0.0
2003 3803 0.0 0.0 0.0
2004 1464 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References