X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254231205002

Well Details

Well ID: 0254231205002
Loading map...
Location: 00/05-12-025-23W4/2
Location Alias: 00/05-12-25-23 W4M
Location Alias 2: 00/05-12-025-23 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 12
County/Municipality: Wheatland County
Well Name: ECA PARFLESH 5-12-25-23
Operator Name: Lynx Energy ULC
License Number: 0419361
License Date: 2010-03-22
License Status: Issued
Spud Date: 2010-11-21
Final Drill Date: 2010-11-30
Well Total Depth: 1590.00 m
Surface Hole Latitude: 51.115125
Surface Hole Longitude: -113.090902

For data sources see[1][2]

Well History

Date Event
2010-03-22 Obtained License
2010-11-21 Surface Casing Operation Performed
2010-11-28 Direction Drilling Operation Performed - Deviate
2010-11-30 Finished Drilling
2010-11-30 Well Mode changed to Drilled and Cased
2010-12-01 Production Casing Operation Performed
2010-12-01 Rig Released
2010-12-01 Well Log Performed
2010-12-17 Perforation Treatment Performed - Jet Perforation
2010-12-17 Well Log Performed
2011-01-05 Well Log Performed
2011-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-06 Perforation Treatment Performed - Jet Perforation
2011-01-06 Plug Back Performed
2011-01-20 Perforation Treatment Performed - Jet Perforation
2011-01-21 Well Log Performed
2011-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-22 Plug Back Performed
2011-01-22 Well Mode changed to Abandoned Zone
2011-01-23 Perforation Treatment Performed - Jet Perforation
2011-01-23 Well Log Performed
2011-03-07 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-28 370.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-17 Perforation 1521.00 1522.00 17
2011-03-07 Fracture 628.00 629.00 0
2011-03-07 Fracture 576.00 578.00 0
2011-03-07 Fracture 561.00 562.00 0
2011-01-06 Perforation 1339.00 1340.00 17
2011-01-06 Packing Device Capped w/Cement 1508.00 1516.00 0
2011-01-20 Perforation 644.00 646.00 13
2011-01-22 Packing Device Capped w/Cement 1327.00 1335.00 0
2011-01-23 Perforation 561.00 562.00 13
2011-01-23 Perforation 576.00 578.00 13
2011-01-23 Perforation 628.00 629.00 13
2011-03-07 Fracture 644.00 646.00 0

For data sources see[5]



References