X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254231104002

Well Details

Well ID: 0254231104002
Loading map...
Location: 00/04-11-025-23W4/2
Location Alias: 00/04-11-25-23 W4M
Location Alias 2: 00/04-11-025-23 W4/02
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 11
County/Municipality: Wheatland County
Well Name: ECA ECOG PARFLESH 4-11-25-23
Operator Name: Lynx Energy ULC
License Number: 0407953
License Date: 2009-01-14
License Status: Issued
Spud Date: 2009-01-24
Final Drill Date: 2009-01-29
Well Total Depth: 858.00 m
Surface Hole Latitude: 51.111004
Surface Hole Longitude: -113.118417

For data sources see[1][2]

Well History

Date Event
2009-01-14 Obtained License
2009-01-24 Lost Circulation Occurred
2009-01-24 Surface Casing Operation Performed
2009-01-29 Finished Drilling
2009-01-29 Production Casing Operation Performed
2009-01-29 Rig Released
2009-01-29 Well Mode changed to Drilled and Cased
2009-02-02 Well Log Performed
2009-02-11 Perforation Treatment Performed - Jet Perforation
2009-02-21 Perforation Treatment Performed - Fractured
2010-01-06 Perforation Treatment Performed - Jet Perforation
2010-01-23 Perforation Treatment Performed - Fractured
2010-01-27 Well Structure changed to Commingled
2010-04-09 Well Log Performed
2010-06-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-11 Perforation 785.00 788.00 13
2009-02-21 Fracture 739.00 742.00 0
2009-02-21 Fracture 728.00 732.00 0
2009-02-21 Fracture 705.00 708.00 0
2009-02-21 Fracture 345.00 353.00 0
2010-01-06 Perforation 490.80 491.30 13
2010-01-06 Perforation 484.90 485.90 13
2010-01-06 Perforation 440.50 441.50 13
2010-01-06 Perforation 422.40 422.90 13
2010-01-06 Perforation 408.70 409.70 13
2010-01-06 Perforation 354.00 356.00 13
2009-02-11 Perforation 739.00 742.00 13
2010-01-06 Perforation 340.00 341.00 13
2010-01-06 Perforation 336.70 337.20 13
2010-01-06 Perforation 323.50 324.00 13
2010-01-06 Perforation 313.20 313.70 13
2010-01-06 Perforation 305.60 306.10 13
2010-01-06 Perforation 302.00 302.50 13
2010-01-06 Perforation 298.70 299.70 13
2010-01-23 Fracture 298.70 491.30 0
2009-02-11 Perforation 730.50 732.00 13
2009-02-11 Perforation 728.00 729.50 13
2009-02-11 Perforation 705.00 708.00 13
2009-02-11 Perforation 351.00 353.00 13
2009-02-11 Perforation 347.50 350.00 13
2009-02-11 Perforation 345.00 347.00 13
2009-02-21 Fracture 785.00 788.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-01-24 Lost Circulation 28.00 48.00

For data sources see[5]

References