X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254230108004

Well Details

Well ID: 0254230108004
Loading map...
Location: 00/08-01-025-23W4/4
Location Alias: 00/08-01-25-23 W4M
Location Alias 2: 00/08-01-025-23 W4/04
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 23
Section: 01
County/Municipality: Wheatland County
Well Name: ECA PARFLESH 8-1-25-23
Operator Name: Lynx Energy ULC
License Number: 0424359
License Date: 2010-10-08
License Status: Issued
Spud Date: 2011-01-01
Final Drill Date: 2011-01-14
Well Total Depth: 803.00 m
Surface Hole Latitude: 51.100197
Surface Hole Longitude: -113.077019

For data sources see[1][2]

Well History

Date Event
2010-10-08 Obtained License
2011-01-01 Surface Casing Operation Performed
2011-01-14 Finished Drilling
2011-01-14 Production Casing Operation Performed
2011-01-14 Rig Released
2011-01-14 Well Mode changed to Drilled and Cased
2011-01-17 Well Log Performed
2011-02-05 Perforation Treatment Performed - Jet Perforation
2011-02-05 Well Log Performed
2011-03-10 Perforation Treatment Performed - Jet Perforation
2011-05-14 Perforation Treatment Performed - Fractured
2011-06-08 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-05 Perforation 730.00 733.00 13
2011-03-10 Perforation 444.50 445.50 13
2011-03-10 Perforation 436.20 436.70 13
2011-03-10 Perforation 432.60 433.10 13
2011-03-10 Perforation 429.50 430.50 13
2011-03-10 Perforation 384.90 385.90 13
2011-03-10 Perforation 366.90 367.90 13
2011-03-10 Perforation 352.00 353.00 13
2011-03-10 Perforation 295.20 298.20 13
2011-03-10 Perforation 291.60 292.60 13
2011-03-10 Perforation 275.00 276.00 13
2011-02-05 Perforation 710.00 711.00 13
2011-03-10 Perforation 271.90 272.40 13
2011-03-10 Perforation 262.10 262.60 13
2011-03-10 Perforation 254.60 255.10 13
2011-03-10 Perforation 249.90 251.90 13
2011-03-10 Perforation 245.90 246.90 13
2011-03-10 Perforation 241.00 242.00 13
2011-03-10 Perforation 315.00 316.00 13
2011-03-10 Perforation 311.00 314.00 13
2011-03-10 Perforation 283.00 286.00 13
2011-05-14 Fracture 715.80 721.90 0
2011-02-05 Perforation 694.00 695.00 13
2011-05-14 Fracture 429.50 450.00 0
2011-05-14 Fracture 241.00 385.90 0
2011-05-14 Fracture 311.00 316.00 0
2011-05-14 Fracture 283.00 286.00 0
2011-02-05 Perforation 658.50 659.50 13
2011-02-05 Perforation 598.00 600.00 13
2011-03-10 Perforation 721.40 721.90 13
2011-03-10 Perforation 719.40 719.90 13
2011-03-10 Perforation 715.80 716.80 13
2011-03-10 Perforation 449.50 450.00 13

For data sources see[4]



References