If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254223603003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.171122,"lon":-112.951474,"icon":""}]} |
Location: 00/03-36-025-22W4/3 | |
Location Alias: 00/03-36-25-22 W4M | |
Location Alias 2: 00/03-36-025-22 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 36 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG HUSSAR 3-36-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0311612 | |
License Date: 2004-07-12 | |
License Status: Abandoned | |
Spud Date: 2004-07-29 | |
Final Drill Date: 2004-07-31 | |
Well Total Depth: 886.00 m | |
Surface Hole Latitude: 51.171122 | |
Surface Hole Longitude: -112.951474 |
Date | Event |
---|---|
2004-07-12 | Obtained License |
2004-07-29 | Surface Casing Operation Performed |
2004-07-31 | Finished Drilling |
2004-07-31 | Well Mode changed to Drilled and Cased |
2004-08-01 | Production Casing Operation Performed |
2004-08-01 | Rig Released |
2004-08-13 | Well Log Performed |
2004-11-04 | Perforation Treatment Performed - Jet Perforation |
2005-01-22 | Perforation Treatment Performed - Fractured |
2005-02-04 | Perforation Treatment Performed - Jet Perforation |
2005-03-17 | Perforation Treatment Performed - Jet Perforation |
2005-04-27 | Well Log Performed |
2006-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-23 | Plug Back Performed |
2006-02-23 | Well Log Performed |
2006-02-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-02-24 | Plug Back Performed |
2006-02-24 | Well Log Performed |
2006-02-25 | Well Log Performed |
2006-02-27 | Perforation Treatment Performed - Cement Squeeze |
2006-02-28 | Well Log Performed |
2006-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-01 | Perforation Treatment Performed - Cement Squeeze |
2006-03-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-27 | Plug Back Performed |
2006-03-27 | Well Mode changed to Abandoned Zone |
2006-09-09 | Well Abandoned |
2006-09-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-04 | Perforation | 802.00 | 804.00 | 13 |
2005-03-17 | Perforation | 359.30 | 361.30 | 13 |
2005-03-17 | Perforation | 348.10 | 350.10 | 13 |
2005-03-17 | Perforation | 328.50 | 329.50 | 13 |
2005-03-17 | Perforation | 323.50 | 324.50 | 13 |
2005-03-17 | Perforation | 293.50 | 294.50 | 13 |
2005-03-17 | Perforation | 283.10 | 284.10 | 13 |
2005-03-17 | Perforation | 245.90 | 246.90 | 13 |
2005-03-17 | Perforation | 241.90 | 242.90 | 13 |
2005-03-17 | Perforation | 234.30 | 235.30 | 13 |
2005-03-17 | Perforation | 228.90 | 229.90 | 13 |
2005-01-22 | Fracture | 802.00 | 804.00 | 0 |
2005-03-17 | Perforation | 227.30 | 228.30 | 13 |
2005-03-17 | Perforation | 218.90 | 219.90 | 13 |
2006-02-23 | Packing Device Capped w/Cement | 787.00 | 795.00 | 0 |
2006-02-23 | Packing Device Capped w/Cement | 502.00 | 510.00 | 0 |
2006-02-24 | Packing Device Capped w/Cement | 422.00 | 430.00 | 0 |
2006-02-24 | Packing Device Capped w/Cement | 349.00 | 357.00 | 0 |
2006-02-27 | Cement Squeeze | 323.50 | 329.50 | 0 |
2006-03-01 | Cement Squeeze | 227.30 | 294.50 | 0 |
2006-03-01 | Packing Device Capped w/Cement | 277.00 | 300.00 | 0 |
2006-03-27 | Packing Device Capped w/Cement | 119.00 | 224.00 | 0 |
2005-02-04 | Perforation | 450.00 | 451.50 | 13 |
2005-03-17 | Perforation | 514.70 | 515.70 | 13 |
2005-03-17 | Perforation | 472.00 | 473.00 | 13 |
2005-03-17 | Perforation | 452.00 | 453.00 | 13 |
2005-03-17 | Perforation | 433.50 | 434.50 | 13 |
2005-03-17 | Perforation | 373.90 | 374.90 | 13 |
2005-03-17 | Perforation | 362.70 | 363.70 | 13 |
For data sources see[4]