X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254222815004

Well Details

Well ID: 0254222815004
Loading map...
Location: 00/15-28-025-22W4/4
Location Alias: 00/15-28-25-22 W4M
Location Alias 2: 00/15-28-025-22 W4/04
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 22
Section: 28
County/Municipality: Wheatland County
Well Name: ECA ECOG PARFLESH 15-28-25-22
Operator Name: Lynx Energy ULC
License Number: 0408622
License Date: 2009-01-27
License Status: Issued
Spud Date: 2009-02-03
Final Drill Date: 2009-09-29
Well Total Depth: 876.00 m
Surface Hole Latitude: 51.166122
Surface Hole Longitude: -113.013042

For data sources see[1][2]

Well History

Date Event
2009-01-27 Obtained License
2009-02-03 Surface Casing Operation Performed
2009-09-29 Finished Drilling
2009-09-29 Production Casing Operation Performed
2009-09-29 Rig Released
2009-09-29 Well Mode changed to Drilled and Cased
2009-10-07 Well Log Performed
2009-10-26 Perforation Treatment Performed - Jet Perforation
2009-11-09 Perforation Treatment Performed - Fractured
2010-05-26 Perforation Treatment Performed - Jet Perforation
2010-06-25 Perforation Treatment Performed - Fractured
2010-06-28 Well Structure changed to Commingled
2010-08-09 Well Log Performed
2010-11-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-26 Perforation 807.50 809.50 13
2009-11-09 Fracture 772.50 773.50 0
2009-11-09 Fracture 729.00 731.00 0
2009-11-09 Fracture 645.00 650.00 0
2010-05-26 Perforation 322.00 322.50 13
2010-05-26 Perforation 325.60 326.10 13
2010-05-26 Perforation 330.90 331.40 13
2010-05-26 Perforation 319.00 319.50 13
2010-05-26 Perforation 354.20 357.20 13
2010-05-26 Perforation 795.50 796.50 13
2010-05-26 Perforation 234.00 234.50 13
2009-10-26 Perforation 805.50 806.50 13
2010-05-26 Perforation 340.50 341.50 13
2010-05-26 Perforation 446.20 448.20 13
2010-05-26 Perforation 467.20 468.20 13
2010-05-26 Perforation 508.40 508.90 13
2010-05-26 Perforation 433.50 434.00 13
2010-05-26 Perforation 380.00 381.00 13
2010-05-26 Perforation 376.70 377.20 13
2010-05-26 Perforation 383.40 383.90 13
2010-05-26 Perforation 354.20 357.20 13
2010-06-25 Fracture 341.50 354.20 0
2009-10-26 Perforation 791.00 792.50 13
2010-06-25 Fracture 234.00 508.90 0
2010-06-25 Fracture 795.50 796.50 0
2009-10-26 Perforation 772.50 773.50 13
2009-10-26 Perforation 729.00 731.00 13
2009-10-26 Perforation 649.00 650.00 13
2009-10-26 Perforation 645.00 646.00 13
2009-11-09 Fracture 805.50 809.50 0
2009-11-09 Fracture 791.00 792.50 0

For data sources see[4]



References