If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.16848,"lon":-112.985361,"icon":""}]} |
Location: 00/16-27-025-22W4/0 | |
Location Alias: 00/16-27-25-22 W4M | |
Location Alias 2: 00/16-27-025-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: ECA ECOG PARFLESH 16-27-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0408599 | |
License Date: 2009-01-26 | |
License Status: Issued | |
Spud Date: 2009-02-04 | |
Final Drill Date: 2009-10-01 | |
Well Total Depth: 823.00 m | |
Surface Hole Latitude: 51.168480 | |
Surface Hole Longitude: -112.985361 |
Date | Event |
---|---|
2009-01-26 | Obtained License |
2009-02-04 | Surface Casing Operation Performed |
2009-10-01 | Finished Drilling |
2009-10-01 | Production Casing Operation Performed |
2009-10-01 | Rig Released |
2009-10-01 | Well Mode changed to Drilled and Cased |
2009-10-07 | Well Log Performed |
2009-10-29 | Perforation Treatment Performed - Jet Perforation |
2009-11-10 | Perforation Treatment Performed - Fractured |
2009-11-13 | Well Fluid changed to Gas |
2009-11-13 | Well Mode changed to Testing |
2009-11-26 | Well Began Production |
2009-11-26 | Well Fluid changed to Gas |
2009-11-26 | Well Mode changed to Flowing |
2010-05-21 | Perforation Treatment Performed - Jet Perforation |
2010-05-25 | Perforation Treatment Performed - Fractured |
2010-05-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-05-27 | Well Mode changed to Flowing |
2010-07-08 | Well Log Performed |
2010-09-03 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-29 | Perforation | 751.00 | 752.00 | 13 |
2009-10-29 | Perforation | 579.60 | 580.60 | 13 |
2009-10-29 | Perforation | 576.50 | 578.00 | 13 |
2009-11-10 | Fracture | 751.00 | 752.00 | 0 |
2009-11-10 | Fracture | 709.50 | 711.00 | 0 |
2009-11-10 | Fracture | 687.50 | 694.50 | 0 |
2009-11-10 | Fracture | 674.00 | 677.00 | 0 |
2009-11-10 | Fracture | 659.80 | 661.30 | 0 |
2009-11-10 | Fracture | 605.50 | 607.00 | 0 |
2009-11-10 | Fracture | 576.50 | 583.00 | 0 |
2010-05-21 | Perforation | 282.00 | 282.50 | 13 |
2009-10-29 | Perforation | 726.00 | 728.00 | 13 |
2010-05-21 | Perforation | 278.00 | 278.50 | 13 |
2010-05-21 | Perforation | 302.30 | 302.80 | 13 |
2010-05-21 | Perforation | 290.50 | 292.50 | 13 |
2010-05-21 | Perforation | 745.00 | 746.00 | 13 |
2010-05-21 | Perforation | 737.40 | 737.90 | 13 |
2010-05-21 | Perforation | 273.80 | 274.30 | 13 |
2010-05-21 | Perforation | 185.50 | 186.00 | 13 |
2010-05-21 | Perforation | 414.70 | 415.70 | 13 |
2010-05-21 | Perforation | 395.40 | 395.90 | 13 |
2010-05-21 | Perforation | 472.30 | 472.80 | 13 |
2009-10-29 | Perforation | 709.50 | 711.00 | 13 |
2010-05-21 | Perforation | 454.00 | 454.50 | 13 |
2010-05-21 | Perforation | 305.00 | 305.50 | 13 |
2010-05-21 | Perforation | 323.50 | 324.50 | 13 |
2010-05-21 | Perforation | 381.00 | 381.50 | 13 |
2010-05-21 | Perforation | 326.30 | 326.80 | 13 |
2010-05-25 | Fracture | 737.40 | 746.00 | 0 |
2010-05-25 | Fracture | 273.80 | 472.80 | 0 |
2009-10-29 | Perforation | 693.50 | 694.50 | 13 |
2009-10-29 | Perforation | 687.50 | 689.50 | 13 |
2009-10-29 | Perforation | 674.00 | 677.00 | 13 |
2009-10-29 | Perforation | 659.80 | 661.30 | 13 |
2009-10-29 | Perforation | 605.50 | 607.00 | 13 |
2009-10-29 | Perforation | 581.50 | 583.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 854 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8737 | 0.0 | 0.0 | 0.0 |
2013 | 8673 | 0.0 | 0.0 | 0.0 |
2014 | 8688 | 0.0 | 0.0 | 0.0 |
2015 | 8734 | 0.0 | 0.0 | 0.0 |
2016 | 8701 | 0.0 | 0.0 | 0.0 |
2017 | 8672 | 0.0 | 0.0 | 0.0 |
2018 | 8746 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]