If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254222710005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.163421,"lon":-112.989603,"icon":""}]} |
Location: 00/10-27-025-22W4/5 | |
Location Alias: 00/10-27-25-22 W4M | |
Location Alias 2: 00/10-27-025-22 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 22 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: PCP PCR PARFLESH 10-27-25-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0255569 | |
License Date: 2001-05-29 | |
License Status: Suspension | |
Spud Date: 2001-06-19 | |
Final Drill Date: 2001-06-27 | |
Well Total Depth: 1620.00 m | |
Surface Hole Latitude: 51.163421 | |
Surface Hole Longitude: -112.989603 |
Date | Event |
---|---|
2001-05-29 | Obtained License |
2001-06-20 | Surface Casing Operation Performed |
2001-06-27 | Finished Drilling |
2001-06-27 | Well Log Performed |
2001-06-27 | Well Mode changed to Drilled and Cased |
2001-06-28 | Production Casing Operation Performed |
2001-06-28 | Rig Released |
2001-06-28 | Well Log Performed |
2001-09-19 | Perforation Treatment Performed - Jet Perforation |
2001-09-19 | Well Log Performed |
2001-10-02 | Perforation Treatment Performed - Fractured |
2008-12-09 | Perforation Treatment Performed - Jet Perforation |
2008-12-09 | Well Log Performed |
2009-02-18 | Perforation Treatment Performed - Fractured |
2009-09-04 | Well Log Performed |
2009-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-09-10 | Perforation Treatment Performed - Cement Squeeze |
2009-09-10 | Plug Back Performed |
2011-06-23 | Perforation Treatment Performed - Jet Perforation |
2011-06-23 | Well Log Performed |
2011-06-29 | Perforation Treatment Performed - Fractured |
2011-07-06 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-09-19 | Perforation | 1592.00 | 1595.00 | 20 |
2009-09-10 | Cement Squeeze | 1488.30 | 1537.50 | 0 |
2009-09-10 | Packing Device Capped w/Cement | 1309.90 | 1538.50 | 0 |
2011-06-23 | Perforation | 373.00 | 376.00 | 13 |
2011-06-23 | Perforation | 430.00 | 431.00 | 13 |
2011-06-23 | Perforation | 444.50 | 445.00 | 13 |
2011-06-23 | Perforation | 343.00 | 344.00 | 13 |
2011-06-23 | Perforation | 356.50 | 357.50 | 13 |
2011-06-23 | Perforation | 358.70 | 359.20 | 13 |
2011-06-23 | Perforation | 463.80 | 464.80 | 13 |
2011-06-23 | Perforation | 619.00 | 620.00 | 13 |
2001-10-02 | Fracture | 1592.00 | 1595.00 | 0 |
2011-06-23 | Perforation | 634.50 | 635.50 | 13 |
2011-06-23 | Perforation | 646.00 | 647.00 | 13 |
2011-06-23 | Perforation | 501.50 | 502.00 | 13 |
2011-06-23 | Perforation | 503.00 | 504.00 | 13 |
2011-06-23 | Perforation | 507.50 | 508.50 | 13 |
2011-06-23 | Perforation | 337.00 | 338.00 | 13 |
2011-06-23 | Perforation | 728.00 | 730.00 | 13 |
2011-06-23 | Perforation | 240.50 | 241.00 | 13 |
2011-06-23 | Perforation | 791.50 | 792.50 | 13 |
2011-06-23 | Perforation | 784.00 | 785.00 | 13 |
2008-12-09 | Perforation | 1536.50 | 1537.50 | 17 |
2011-06-23 | Perforation | 787.70 | 788.20 | 13 |
2011-06-23 | Perforation | 243.00 | 244.00 | 13 |
2011-06-23 | Perforation | 333.00 | 334.00 | 13 |
2011-06-23 | Perforation | 325.00 | 326.00 | 13 |
2011-06-23 | Perforation | 328.50 | 329.50 | 13 |
2011-06-23 | Perforation | 247.80 | 248.30 | 13 |
2011-06-23 | Perforation | 322.70 | 323.20 | 13 |
2011-06-29 | Fracture | 240.50 | 464.80 | 0 |
2011-06-29 | Fracture | 501.50 | 647.00 | 0 |
2011-06-29 | Fracture | 728.00 | 730.00 | 0 |
2008-12-09 | Perforation | 1517.50 | 1518.50 | 17 |
2011-06-29 | Fracture | 791.50 | 792.50 | 0 |
2008-12-09 | Perforation | 1512.50 | 1513.50 | 17 |
2008-12-09 | Perforation | 1488.30 | 1489.30 | 17 |
2009-02-18 | Fracture | 1536.50 | 1537.50 | 0 |
2009-02-18 | Fracture | 1512.50 | 1518.50 | 0 |
2009-02-18 | Fracture | 1488.30 | 1489.30 | 0 |
For data sources see[4]